Today

03:24 PM PIP-II IT HWR Task #24523 (Resolved): HWR 8 Channel Signal Conditioning Chassis
Philip installed on 7/31/20

07/27/2020

03:34 PM PIP-II IT HWR Task #24523: HWR 8 Channel Signal Conditioning Chassis
Updated with resistor value for R4 = 1.21K. 7/27/20

07/23/2020

11:45 AM PIP-II IT HWR Task #24523: HWR 8 Channel Signal Conditioning Chassis
The corrected dynamic range modification and final test results shown in new results document.

07/22/2020

09:06 AM PIP-II IT Beam Pattern Generator Wiki edit: Wiki (#32)

07/21/2020

02:30 PM PIP II IT SSR1 Task #24630: SSR1 Resonance Control chassis
Updated Inventory and Tracking by Andrew Benwell is attached.
02:24 PM PIP-II IT HWR Task #24523 (Work in progress): HWR 8 Channel Signal Conditioning Chassis
Test results were conducted by Philip and I in the Lab. Attached are the results.

07/16/2020

10:39 AM PIP II IT SSR1 Task #24630 (Work in progress): SSR1 Resonance Control chassis
See attachment
10:39 AM PIP II IT SSR1 1.00 hour (Task #24630 (Work in progress): SSR1 Resonance Control chassis)
Complete Inventory and Tracking of all Resonance Controller Chassis'
10:08 AM PIP II IT SSR1 Wiki edit: Resonance_Controller_Chassis'_Inventory (#4)
10:07 AM PIP II IT SSR1 Wiki edit: Resonance_Controller_Chassis'_Inventory (#3)