04/15/2020

01:49 PM BOE and RLS Task #24304: Master BOE
Added notes to MO and PRL, Beam Pattern Generator, and Res Con. Didn't really add anything to BPG other than deleted...

04/13/2020

03:29 PM BOE and RLS Task #24304: Master BOE
I added descriptions for all LLRF Station items on LLRF Station Tab and corrected some paths.

03/13/2020

08:14 AM Main Injector and MRF Task #24171: MI PHIS Front End Repair
There are 2 Acopian model A24MT350 power supplies in stock. No need to order.

02/12/2020

11:20 AM PIP-II IT HWR Task #23959: HWR Resonance control system
Updated wiring diagram of the Signal Conditioning Chassis is attached.

01/29/2020

11:50 AM PIP-II IT HWR Task #23959: HWR Resonance control system
Signal Conditioning Chassis stage 1 drawing is enclosed.

01/15/2020

11:44 AM PIP-II IT HWR Task #23896 (New): Argonne Resonance Controller Troubleshooting & Modifications

12/17/2019

08:52 AM PIP-II IT HWR Task #23587: Terminate cables for HWR valves and pressure transducers
Updated schematic is attached reflecting modifications done to 1 board.

12/13/2019

02:07 PM PIP-II IT HWR Task #23587: Terminate cables for HWR valves and pressure transducers
Modifications to board are shown on attached document.

12/12/2019

03:28 PM PIP-II IT HWR Task #23587: Terminate cables for HWR valves and pressure transducers
12/12/19 Connectors have arrived and I have wired the connectors for Channel 1. Next step is to incorporate the modi...

12/09/2019

09:47 AM PIP-II IT HWR Task #23587: Terminate cables for HWR valves and pressure transducers
Credit card order was made on Thursday 12/5/19. Should receive components any day now.