12:26 PM PIP II IT SSR1 Task #25216: Testing and Installing 2 RCC at CMTF
The FPGA configuration bit file update procedure was exercised successfully.
The listing of commands and messages is...
12:26 PM PIP II IT SSR1 0.50 hour (Task #25216 (New): Testing and Installing 2 RCC at CMTF)
RCC Bit file Copy Procedure

11/16/2020

04:26 PM PIP II IT SSR1 RCC @ PIP-II.pdf
RCC_Test_Procedure
04:24 PM PIP II IT SSR1 res_ctl_data_tools.pdf
RCC_Tools
03:57 PM PIP II IT SSR1 Task #25216: Testing and Installing 2 RCC at CMTF
The test procedure outlined in the document RCC@PIP-II was exercised on the SOCMFC - RCC setup in the lab.
A test wa...
03:57 PM PIP II IT SSR1 2.00 hours (Task #25216 (New): Testing and Installing 2 RCC at CMTF)
RCC communication testing
03:53 PM PIP II IT SSR1 Task #25216 (New): Testing and Installing 2 RCC at CMTF
2 RCC chassis are to be configured , tested and installed at CMTF for
SSR1.
Network configuration, fiber link to LL...

11/02/2020

01:08 PM LBL LLRF System Task #25153: LBL LLRF system installation in SSR1
We have successfully configured one RCC for SSR1 in our lab area. There are still some error messages towards
the en...
01:08 PM LBL LLRF System 4.00 hours (Task #25153 (New): LBL LLRF system installation in SSR1)
Configuring the Resonance controller chassis for SSR1

10/30/2020

10:30 AM LBL LLRF System Task #25153 (New): LBL LLRF system installation in SSR1
A RFS LLRF controller is installed in the PIP-II IT SSR1 rack to allow
testing in parallel with the Fermilab LLRF sy...