01/11/2021

04:57 PM QCL_Operations Meeting #25382 (New): QCL Operations Meeting Minutes 2021-01-11

01/04/2021

03:59 PM QCL_Operations Meeting #25361 (New): QCL Operations Meeting Minutes 2021-01-04

12/21/2020

05:15 PM QCL_Operations Meeting #25345 (New): QCL Operations Meeting Minutes 2020-12-21

11/13/2020

09:05 AM Superconducting Quantum Computing Task #25193: DR2 cooldown test
Yesterday Andrew and team installed all magnetic shielding except the outside top layer.

11/12/2020

10:21 PM Superconducting Quantum Computing Task #25193: DR2 cooldown test
1. DR2 frame was modified to lower the vacuum can (VC).
2. VC has been pumped down and passed leak check.
3. Techs ...
10:03 PM Superconducting Quantum Computing Task #25193 (New): DR2 cooldown test
DR2 cooldown test after frame modification