General

Profile

Michael Wallbank

Issues

Projects

Activity

Today

10:37 AM NOvA Test Beam Wiki edit: Period_and_Epoch_Naming (#23)
Properly justify Period 2
10:36 AM NOvA Test Beam Wiki edit: Period_and_Epoch_Naming (#22)
Complete Period 2 epochs
10:19 AM NOvA Test Beam Wiki edit: Running_Conditions (#58)
Add beamline run when switching FEB firmware on Feb 18

03/30/2020

10:28 AM NOvA-ART Revision 41810 (svn): Added an explanation to describe the recent change from last week, for people who may run this not being aware of the change

03/27/2020

04:46 PM NOvA-ART Revision 41796 (svn): Small tweaks to Teresa's full reconstruction configuration to include some recent ToF reco changes. Also minor changes corresponding to the renaming of some Cherenkov configuration names (to Ckov); see BeamlineReco commit 41792
04:43 PM NOvA-ART Revision 41795 (svn): Minor changes corresponding to the renaming of some Cherenkov configuration names (to Ckov); see BeamlineReco commit 41792
04:39 PM NOvA-ART Revision 41794 (svn): Modification to the method used to get the TDU time for this trigger. Previously it used the NOvA DAQ trigger information, but there may be cases we want to run this module without having that information available, e.g. if processing beamline-only data. I kept the default behavior the same but added a second check for a BeamlineTrigger object if the NOvA DAQ trigger object isn't initially found. Everything downstream of obtaining a timestamp remains the same.
04:37 PM NOvA-ART Revision 41793 (svn): Slight modification to magnetic field service to be able to provide the calculated field for a given current. Eventually will include a full field map, right now it remains the very rough approximation. Will be used in cases where the current is obtained from an external source (i.e. IFBeam database)
04:34 PM NOvA-ART Revision 41792 (svn): Add option to Wire Chamber reconstruction to use the magnet current saved in the IFSpill database (and included as information in a dedicated data product, TBSpillInfo). I left it on by default (the alternative is to use the old crappy system of using beamline run numbers, which we're close to deprecating and not updating the configuration as we should be); it should be the only option after a trial period. The tbspillinfo module needs to be run before the wire chamber reco in order to have the information available; I modified the standard beamline-reco file to include it. Also took the opportunity to rename Cherenkov to Ckov in all the configurations to reduce all the long lines in the config files (minor change\!)

03/20/2020

11:29 AM NOvA Test Beam Wiki edit: Running_Conditions (#56)
Add 40 GeV secondary beam study runs

Also available in: Atom