Project

General

Profile

Workstation Layout » History » Version 8

« Previous - Version 8/11 (diff) - Next » - Current version
Simone Marcocci, 05/11/2018 02:02 PM


Workstation Layout

If you are a remote shifter with only six screens, you should arrange them according to the Remote Workstation Layout.

Otherwise, the images below show what windows should be open on what screens.
Most windows are simple browser windows (green) and some have multiple tabs open. There are two VNC windows (yellow), a few terminal windows (black), and other gui windows (red).
For instructions on how to open any given window, see the relevant documentation on the subsystem pages.

Overview of the eight screen layout:

There are eight regular monitors, plus a mac for the event display and a vidyo connection screen. Each monitor is assigned a label (e.g. 1a, 3b) which correspond to individual detailed images below.

Individual screen details

----------------------------------------------------------------------------------------------------------------------------------

Text you can copy here:
http://ubdaq-prod-near2.fnal.gov/lizard/
ubdaq-prod-near2.fnal.gov/Pubs/RunStat.html

If you are not at Fermilab, you will need a VPN connection to FNAL (https://v-main-fcc2-1.fnal.gov/+CSCOE+/logon.html#form_title_text) in order to open these browser pages.
----------------------------------------------------------------------------------------------------------------------------------

Online evd - Guide
----------------------------------------------------------------------------------------------------------------------------------

Text you can copy here:
https://microboone-exp.fnal.gov/at_work/beam/performance/trigger_nearline.html
hangouts.google.com
http://dbweb5.fnal.gov:8080/ifbeam/bmon/numimon/Display
https://microboone-exp.fnal.gov/at_work/expert_call_list.html
----------------------------------------------------------------------------------------------------------------------------------

Text you can copy here:
http://ubdaq-prod-near2.fnal.gov/RunCat/web/
https://dbweb0.fnal.gov/ECL/uboone
cdcvs.fnal.gov/redmine/projects/uboone-operations/wiki
----------------------------------------------------------------------------------------------------------------------------------

----------------------------------------------------------------------------------------------------------------------------------

Text you can copy here:
https://dbweb0.fnal.gov/ECL/uboone
cdcvs.fnal.gov/redmine/projects/uboone-operations/wiki
www-bd.fnal.gov/Elog
----------------------------------------------------------------------------------------------------------------------------------

----------------------------------------------------------------------------------------------------------------------------------

Text you can copy here:
http://www-boone.fnal.gov/monitor/
http://dbweb5.fnal.gov:8080/ifbeam/bmon/bnbmon/Display
----------------------------------------------------------------------------------------------------------------------------------

Argo evd - Guide
----------------------------------------------------------------------------------------------------------------------------------