Run Plan

Contacts

Contact Number Alt Number
Shifter 1 (937) 582-6663 1(937) 5-UBOONE
Backup Shifter 1 (978) 822-2582 9788 BACK UB
ON-CALL: RunCo (Pip) 224 253 2345 / +44 7904 320 078 (UK number)
ON-CALL: Deputy RunCo (Adrien) 630 544 9094

Link to which experts to call in case of other alarms

Run Configuration

Summary

We are currently taking beam data with run config 681. All runs should be set to go for 420 minutes.

Please inform runcos ASAP of any information you receive from MCR about the beam.

Please do not forget to check your runs in the RunCat.

Run Control

Configuration Config ID Time [min]
PHYSICS_BNB_NUMI_MUCS_EXT6990mHz_SWTrigger_2Stream_LowThreshold50_c2 681 420

Notes on current operations:

  • Before resetting the PUBS, please ensure there are no PUBS errors being displayed - if there are, please report this to the Data Management expert (via email) before resetting.
  • The sn_read_lag error is currently our most frequent DAQ alarm. This alarm will appear as a symptom of runs ending; if it clears when the new run begins there is no cause for concern. If you see the alarm appear during an ongoing run, follow the instructions on the Run Control Troubleshooting page (https://cdcvs.fnal.gov/redmine/projects/uboone-operations/wiki/RC_-_Troubleshooting - near the bottom).
  • There is a known problem with the uBooNE RWM readout. If you see that the beam timing from the RWM is bad, you can still mark the run as good (although please still email runcos + Zarko to tell them you saw this). Check the beam timing plots in the OM to ensure that it's only a small proportion of events outside the alarm limits.
  • CRT Crate Rails alarms (uB_CrateRails_CRTUtil*) can be ignored until this line is removed from the run plan.
  • The purity monitor is currently off - don't be alarmed if its plots show no recent updates.
  • If you should see anything that indicates the LArTF network is not responding (DAQ machines not responding, many INVALID alarms in slow controls), contact the runco immediately.
  • We've been seeing frequent mem_free errors on seb06. If the error is minor then there is no need to call the DAQ expert on this front - just send them an email at the end of your shift noting the frequency at which you saw this alarm. Please do not acknowledge it however.
  • Please note that the password of the expert call list was modified recently, and is not the same as the one for DocDB, it is now "$uBneutrino!"

Additional Shifter Requirements:

  • Please follow the Shift_turnover procedures
  • At the end of your shift, please post a plot of the last 8 hours of variable: uB_Cryo_IFIX_1_0/PT102
  • During access to the detector:
    • Please fill out a Beginning of Detector Access and End of Detector Access Form.
    • If the "keytree" alarm occurs, and the persons accessing the platform have not called the shifter first, then call LArTF to find out who is accessing the detector. If no one answers, call the runco.
    • Detector platform access must be cleared by runcos.
    • At the end of detector access, please acknowledge the keybank incomplete alarm.

In Case of Cryo Alarms

All the cryo related alarms from either iFix or slow controls should be documented by shifters in ECL with the alarm variable names.

If a shifter does not receive a call within 15 minutes of seeing a MAJOR cryo alarm: