h1. Rack Power ONOFF procedures
2 1 Sowjanya Gollapinni
3 4 Sowjanya Gollapinni
*Step 0:* go on the platform, with all requirements: Hard hat, closed-toed boots, and most importantly, Two-person rule!
4 1 Sowjanya Gollapinni
5 1 Sowjanya Gollapinni
h2. Readout Electronics Racks Power-Off/On Procedure for Planned Power Outages
6 1 Sowjanya Gollapinni
7 4 Sowjanya Gollapinni
*Step 1:* Make sure the software DAQ/read-out processes are not running. In other words, this means that the platform power off procedure should ONLY be done AFTER the DAQ/computer room racks are powered down. Confirm from the On-call DAQ expert and the uB operator on shift that this is the case before proceeding.
8 3 Sowjanya Gollapinni
9 4 Sowjanya Gollapinni
*Remember, the following racks should be powered off in the following order, and following indicated steps*
10 4 Sowjanya Gollapinni
11 2 Sowjanya Gollapinni
*Side note:* For reference, we are following the reverse of the prescription as written in
12 2 Sowjanya Gollapinni
 http://microboone-docdb.fnal.gov:8080/cgi-bin/RetrieveFile?docid=3825&filename=TPC-R1_Power-up.pdf&version=10 
13 2 Sowjanya Gollapinni
14 1 Sowjanya Gollapinni
*1. TPC-R2 through TPC-R5 power off:*
15 5 Sowjanya Gollapinni
a. Switch off both Wiener PS using the red toggle switch on the front panel (gently push down the toggle switch for 3 seconds until the display turns off).
16 5 Sowjanya Gollapinni
b. Switch off the middle (CB2) and lowest (CB3) circuit breaker (circuit breaker switches have blue LEDs lit on them) by accessing the back side of the rack; verify fans are off.
17 1 Sowjanya Gollapinni
c.  Switch off top (CB1) circuit breaker; verify NetGear network switch inside rack is off.
18 5 Sowjanya Gollapinni
d. Switch off Slow controls using front panel switch on the slow controls panel (gently pull the Chassis on/off switch and press down). The +5V, +3.3V, and RPS Status LEDs should turn off.
19 5 Sowjanya Gollapinni
e. Switch off the RPS (use switch located on the back panel of the RPS unit). Go behind the racks and use a step stool to reach, if needed; verify the AC Output ON, POWER, SENSOR, and ALARM LEDs on the AC Switch Box are off.
20 1 Sowjanya Gollapinni
f. Only the AC Input Good LED on the AC Switch Box should be ON.
21 2 Sowjanya Gollapinni
22 2 Sowjanya Gollapinni
*2. TPC-R1 power off:*
23 5 Sowjanya Gollapinni
a. Switch off Wiener PS using the red toggle switch on the front panel (gently push down the toggle switch for 3 seconds until the display turns off).
24 2 Sowjanya Gollapinni
b. Switch off the lowest (CB3) circuit breaker; verify fans are off.
25 2 Sowjanya Gollapinni
c. Switch off the middle (CB2) circuit breaker; verify NetGear network switch inside rack is off.
26 5 Sowjanya Gollapinni
d. Switch off Slow controls using front panel switch on the slow controls panel  (gently pull the Chassis on/off switch and press down). The +5V, +3.3V, and RPS Status LEDs should turn off.
27 5 Sowjanya Gollapinni
e. Switch off the RPS (use switch located on the back panel of the RPS unit). Go behind the racks and use a step stool to reach, if needed; verify the AC Output ON, POWER, SENSOR, and ALARM LEDs on the AC Switch Box are off.
28 2 Sowjanya Gollapinni
f. Only the AC Input Good LED on the AC Switch Box should be ON.
29 2 Sowjanya Gollapinni
30 2 Sowjanya Gollapinni
*3. LIZ Rack power off:*
31 2 Sowjanya Gollapinni
a. Switch off the two NIM bins using their front panel switches.
32 2 Sowjanya Gollapinni
b. Switch off the function generator (Strobe pulser) using its front panel on/off button.
33 2 Sowjanya Gollapinni
c. Switch off the fan switch on the fan front panel; verify the fan is off.
34 2 Sowjanya Gollapinni
d. Switch off the middle (CB2), top (CB1), and bottom (CB3) circuit breakers. 
35 5 Sowjanya Gollapinni
e. Switch off Slow controls using front panel switch on the slow controls panel  (gently pull the Chassis on/off switch and press down). The +5V, +3.3V, and RPS Status LEDs should turn off.
36 5 Sowjanya Gollapinni
f. Switch off the RPS (use switch located on the back panel of the RPS unit). Go behind the racks and use a step stool to reach, if needed; verify the AC Output ON, POWER, SENSOR, and ALARM LEDs on the AC Switch Box are off.
37 2 Sowjanya Gollapinni
g. Only the AC Input Good LED on the AC Switch Box should be ON.
38 2 Sowjanya Gollapinni
39 2 Sowjanya Gollapinni
*4. PMT/TRIG Rack power off:*
40 5 Sowjanya Gollapinni
a. Switch off Wiener PS using the red toggle switch on the front panel (gently push down the toggle switch for 3 seconds until the display turns off).
41 2 Sowjanya Gollapinni
b. Switch off the NIM bin using its front panel switch.
42 2 Sowjanya Gollapinni
c. Check that the PMT HV (CB3) bottom circuit breaker is off. If not, stop and call a PMT HV expert. 
43 2 Sowjanya Gollapinni
d. Switch off the middle (CB2) circuit breaker; verify the fan is off.
44 2 Sowjanya Gollapinni
e. Switch off the CB1 circuit breaker; verify NetGear network switch inside rack is off.
45 5 Sowjanya Gollapinni
f. Switch off Slow controls using front panel switch on the slow controls panel  (gently pull the Chassis on/off switch and press down). The +5V, +3.3V, and RPS Status LEDs should turn off.
46 5 Sowjanya Gollapinni
g. Switch off the RPS (use switch located on the back panel of the RPS unit). Go behind the racks and use a step stool to reach, if needed; verify the AC Output ON, POWER, SENSOR, and ALARM LEDs on the AC Switch Box are off.
47 2 Sowjanya Gollapinni
h. Only the AC Input Good LED on the AC Switch Box should be ON.
48 2 Sowjanya Gollapinni
49 2 Sowjanya Gollapinni
5. Make an elog entry that the readout electronics racks have been successfully powered off.
50 6 Sowjanya Gollapinni
51 6 Sowjanya Gollapinni
h2. DRIFT HV rack Power-Off/On procedure for Planned Power Outages:
52 6 Sowjanya Gollapinni
53 7 Sowjanya Gollapinni
*First confirm from the On-call Drift HV expert and uB operator on shift that the DRIFT HV is ramped down as per procedure and is at 0 V.
54 6 Sowjanya Gollapinni
Do not proceed without this confirmation.*
55 1 Sowjanya Gollapinni
56 7 Sowjanya Gollapinni
Step 1: After confirming the above, ensure that the Glassman is at 0 V by looking at the power supply front panel. If the power happens to be off, the voltage is 0. 
57 7 Sowjanya Gollapinni
(At this point, if a power outage occurs, it is ok from a HV health standpoint.  The remaining steps are additions for a more graceful shutdown of the entire HV rack.)
58 6 Sowjanya Gollapinni
59 7 Sowjanya Gollapinni
a. After confirming Step 1, turn off the Glassman by pushing the orange on/off button on the front of the supply.
60 7 Sowjanya Gollapinni
b. Turn off the slow controls box by gently pulling the on/off switch on the front left side of the box and pushing it down.
61 6 Sowjanya Gollapinni
RPS can be turned off from the back of unit in the rack.