Rack Power ONOFF procedures » History » Version 16

Sowjanya Gollapinni, 08/21/2015 05:43 PM

1 1 Sowjanya Gollapinni
h1. Rack Power ONOFF procedures
2 1 Sowjanya Gollapinni
3 10 Sowjanya Gollapinni
*Who does this:* In the normal mode of operation, it is expected that ONLY sub-system experts (most probably on-call experts) will do the power off for their respective sub-systems. It is only in their absence and upon approval from the run coordinator that others will be allowed to do this.
4 1 Sowjanya Gollapinni
5 10 Sowjanya Gollapinni
*Step 0:* Go on the platform, with all requirements: Hard hat, closed-toed boots, and most importantly, Two-person rule!
6 10 Sowjanya Gollapinni
7 16 Sowjanya Gollapinni
h2. %{color:green}@Readout Electronics Racks Power-Off/On Procedure for Planned Power Outages@%
8 1 Sowjanya Gollapinni
9 10 Sowjanya Gollapinni
*Step 1:* Make sure the software DAQ/read-out processes are not running. In other words, this means that the platform power off procedure should ONLY be done AFTER the DAQ/read-out processes are brought down gracefully by the DAQ experts. Confirm from the On-call DAQ expert and the uB operator on shift that this is the case before proceeding.
10 3 Sowjanya Gollapinni
11 4 Sowjanya Gollapinni
*Remember, the following racks should be powered off in the following order, and following indicated steps*
12 4 Sowjanya Gollapinni
13 2 Sowjanya Gollapinni
*Side note:* For reference, we are following the reverse of the prescription as written in
14 2 Sowjanya Gollapinni
 http://microboone-docdb.fnal.gov:8080/cgi-bin/RetrieveFile?docid=3825&filename=TPC-R1_Power-up.pdf&version=10 
15 2 Sowjanya Gollapinni
16 1 Sowjanya Gollapinni
*1. TPC-R2 through TPC-R5 power off:*
17 5 Sowjanya Gollapinni
a. Switch off both Wiener PS using the red toggle switch on the front panel (gently push down the toggle switch for 3 seconds until the display turns off).
18 5 Sowjanya Gollapinni
b. Switch off the middle (CB2) and lowest (CB3) circuit breaker (circuit breaker switches have blue LEDs lit on them) by accessing the back side of the rack; verify fans are off.
19 1 Sowjanya Gollapinni
c.  Switch off top (CB1) circuit breaker; verify NetGear network switch inside rack is off.
20 11 Sowjanya Gollapinni
d. Switch off Slow controls using front panel switch on the slow controls panel (gently pull the Chassis on/off switch and press down). The +5V, +3.3V, and Heart Beat LEDs should turn off.
21 5 Sowjanya Gollapinni
e. Switch off the RPS (use switch located on the back panel of the RPS unit). Go behind the racks and use a step stool to reach, if needed; verify the AC Output ON, POWER, SENSOR, and ALARM LEDs on the AC Switch Box are off.
22 1 Sowjanya Gollapinni
f. Only the AC Input Good LED on the AC Switch Box should be ON.
23 2 Sowjanya Gollapinni
24 2 Sowjanya Gollapinni
*2. TPC-R1 power off:*
25 5 Sowjanya Gollapinni
a. Switch off Wiener PS using the red toggle switch on the front panel (gently push down the toggle switch for 3 seconds until the display turns off).
26 14 Sowjanya Gollapinni
b. Switch off the lowest (CB3) circuit breaker; verify fans are off.
27 14 Sowjanya Gollapinni
c. Switch off the middle (CB2) circuit breaker; verify NetGear network switch inside rack is off.
28 14 Sowjanya Gollapinni
d. Switch off Slow controls using front panel switch on the slow controls panel  (gently pull the Chassis on/off switch and press down). The +5V, +3.3V, and Heart Beat LEDs should turn off.
29 14 Sowjanya Gollapinni
e. Switch off the RPS (use switch located on the back panel of the RPS unit). Go behind the racks and use a step stool to reach, if needed; verify the AC Output ON, POWER, SENSOR, and ALARM LEDs on the AC Switch Box are off.
30 2 Sowjanya Gollapinni
f. Only the AC Input Good LED on the AC Switch Box should be ON.
31 2 Sowjanya Gollapinni
32 2 Sowjanya Gollapinni
*3. LIZ Rack power off:*
33 2 Sowjanya Gollapinni
a. Switch off the two NIM bins using their front panel switches.
34 2 Sowjanya Gollapinni
b. Switch off the function generator (Strobe pulser) using its front panel on/off button.
35 2 Sowjanya Gollapinni
c. Switch off the fan switch on the fan front panel; verify the fan is off.
36 2 Sowjanya Gollapinni
d. Switch off the middle (CB2), top (CB1), and bottom (CB3) circuit breakers. 
37 11 Sowjanya Gollapinni
e. Switch off Slow controls using front panel switch on the slow controls panel  (gently pull the Chassis on/off switch and press down). The +5V, +3.3V, and Heart Beat LEDs should turn off.
38 5 Sowjanya Gollapinni
f. Switch off the RPS (use switch located on the back panel of the RPS unit). Go behind the racks and use a step stool to reach, if needed; verify the AC Output ON, POWER, SENSOR, and ALARM LEDs on the AC Switch Box are off.
39 1 Sowjanya Gollapinni
g. Only the AC Input Good LED on the AC Switch Box should be ON.
40 2 Sowjanya Gollapinni
41 5 Sowjanya Gollapinni
*4. PMT/TRIG Rack power off:*
42 2 Sowjanya Gollapinni
a. Switch off Wiener PS using the red toggle switch on the front panel (gently push down the toggle switch for 3 seconds until the display turns off).
43 13 Kazuhiro Terao
b. Switch off the NIM bin using its front panel switch.
44 14 Sowjanya Gollapinni
c. Check that the PMT HV (CB3) bottom circuit breaker is off. If not, stop and call a PMT HV expert. 
45 14 Sowjanya Gollapinni
d. Switch off the middle (CB2) circuit breaker; verify the fan is off.
46 14 Sowjanya Gollapinni
e. Switch off the CB1 circuit breaker; verify NetGear network switch inside rack is off.
47 14 Sowjanya Gollapinni
f. Switch off Slow controls using front panel switch on the slow controls panel  (gently pull the Chassis on/off switch and press down). The +5V, +3.3V, and Heart Beat LEDs should turn off.
48 14 Sowjanya Gollapinni
g. Switch off the RPS (use switch located on the back panel of the RPS unit). Go behind the racks and use a step stool to reach, if needed; verify the AC Output ON, POWER, SENSOR, and ALARM LEDs on the AC Switch Box are off.
49 14 Sowjanya Gollapinni
h. Only the AC Input Good LED on the AC Switch Box should be ON.
50 2 Sowjanya Gollapinni
51 14 Sowjanya Gollapinni
5. Make an elog entry that the readout electronics racks have been successfully powered off.
52 6 Sowjanya Gollapinni
53 6 Sowjanya Gollapinni
h2. DRIFT HV rack Power-Off/On procedure for Planned Power Outages:
54 1 Sowjanya Gollapinni
55 1 Sowjanya Gollapinni
*First confirm from the On-call Drift HV expert and uB operator on shift that the DRIFT HV is ramped down as per procedure and is at 0 V.
56 1 Sowjanya Gollapinni
Do not proceed without this confirmation.*
57 1 Sowjanya Gollapinni
58 1 Sowjanya Gollapinni
Step 1: After confirming the above, ensure that the Glassman is at 0 V by looking at the power supply front panel. If the power happens to be off, the voltage is 0. 
59 1 Sowjanya Gollapinni
(At this point, if a power outage occurs, it is ok from a HV health standpoint.  The remaining steps are additions for a more graceful shutdown of the entire HV rack.)
60 1 Sowjanya Gollapinni
61 1 Sowjanya Gollapinni
a. After confirming Step 1, turn off the Glassman by pushing the orange on/off button on the front of the supply.
62 1 Sowjanya Gollapinni
b. Turn off the slow controls box by gently pulling the on/off switch on the front left side of the box and pushing it down. The +5V, +3.3V, and RPS Status LEDs should turn off.
63 1 Sowjanya Gollapinni
c. Switch off the RPS (use switch located on the back panel of the RPS unit). Go behind the racks and use a step stool to reach, if needed; verify the AC Output ON, POWER, SENSOR, and ALARM LEDs on the AC Switch Box are off.
64 1 Sowjanya Gollapinni
f. Only the AC Input Good LED on the AC Switch Box should be ON.
65 1 Sowjanya Gollapinni
66 1 Sowjanya Gollapinni
Once done, let the uB operator on shift know that the power-off is done and make an e-log entry that the rack has been successfully powered off.
67 14 Sowjanya Gollapinni
68 14 Sowjanya Gollapinni
h2. ZMON box Power-Off/On procedure for Planned Power Outages:
69 14 Sowjanya Gollapinni
70 14 Sowjanya Gollapinni
a. The ZMON unit is located separately on a single shelf next to the PM01 rack. Turn off the ZMON slow controls box by gently pulling the on/off switch on the front left side of the box and pushing it down.
71 14 Sowjanya Gollapinni
72 14 Sowjanya Gollapinni
h2. TPC-PS (subsystem: OnDetPower) rack Power-Off/On procedure for Planned Power Outages:
73 14 Sowjanya Gollapinni
74 14 Sowjanya Gollapinni
*The TPC-PS rack power down CANNOT be done until the TPCPS expert has gracefully brought all channels down and turned them off including the Power supply Main Switch. First confirm from the uB operators on shift that this has been done. Once confirmed, proceed with the steps below.*
75 14 Sowjanya Gollapinni
76 14 Sowjanya Gollapinni
a. Switch off the Wiener MPOD power supply (located on the bottom portion of the rack) by pressing the front panel ON/OFF switch. The front panel display should turn off.
77 14 Sowjanya Gollapinni
b. Switch off the Calibration Pulsar (needs picture and location in the rack)
78 14 Sowjanya Gollapinni
c. Turn off the Slow controls box (second box from top). Slightly (and gently) pull the Chasis ON/OFF switch and press down. All LEDs should come down.
79 14 Sowjanya Gollapinni
d. Now, go to the back side of the rack, and open the back door of the rack and power off the RPS ON/OFF switch located on the back panel of the RPS box (Top most box in the rack). Use step stool if needed to reach the switch.
80 14 Sowjanya Gollapinni
e. Flip all the Eaton breaker switches down (Eaton breaker switches are located on the right side of each rack with blue lights lit. There are 3 Eaton switches per rack)
81 14 Sowjanya Gollapinni
82 14 Sowjanya Gollapinni
h2. Purity Monitor (PM01, PM02 and PM03) rack Power-Off/On procedure for Planned Power Outages:
83 8 Sowjanya Gollapinni
84 8 Sowjanya Gollapinni
h2. LASER racks Power-Off/On procedure for Planned Power Outages:
85 8 Sowjanya Gollapinni
86 9 Sowjanya Gollapinni
*First confirm from the On-call LASER expert and uB operator on shift that the LASER is off and the Laser computers that are in the rack are also gracefully brought down. 
87 8 Sowjanya Gollapinni
Do not proceed without this confirmation.*
88 8 Sowjanya Gollapinni
89 9 Sowjanya Gollapinni
a. After confirming above, ??
90 8 Sowjanya Gollapinni
b. Turn off the slow controls box by gently pulling the on/off switch on the front left side of the box and pushing it down. The +5V, +3.3V, and RPS Status LEDs should turn off.
91 8 Sowjanya Gollapinni
c. Switch off the RPS (use switch located on the back panel of the RPS unit). Go behind the racks and use a step stool to reach, if needed; verify the AC Output ON, POWER, SENSOR, and ALARM LEDs on the AC Switch Box are off.
92 8 Sowjanya Gollapinni
f. Only the AC Input Good LED on the AC Switch Box should be ON.
93 8 Sowjanya Gollapinni
94 8 Sowjanya Gollapinni
Once done, let the uB operator on shift know that the power-off is done and make an e-log entry that the rack has been successfully powered off.