Expert - Power up procedure

After a power outage, there will be dedicated steps to turn on the rack.
Make sure, the power strip in the back is turned on.
Disconnect the EPO input on the UPS above the server
Start this UPS, which than will automatically power the RPS.
Afterwards, connect the EPO input again.

Check that all other items are turned back on now (e.g. NIM bin + Fan, Slow control monitor, Big UPS above the Laser, etc...)

Before starting the Laser PC/Server, read this: Never start the server, when the ubdaq-prod-evb server is down, as it mounts the home directory from here!