Project

General

Profile

Spent time

Filters

Apply Clear

Hours: 643.25

Date User Activity Issue Comment Hours
03/10/2021 Shrividhyaa Sankar Raman Development Feature #25603: Quench Detection and RF overdrive Protection Software development 8.00
01/27/2021 Shrividhyaa Sankar Raman Deployment Feature #24736: Connect, instrument and test Berkeley Detune and Quench Detection Block 20.00
01/27/2021 Shrividhyaa Sankar Raman Testing Milestone #23593: LLRF Controller Installation 20.00
01/27/2021 Shrividhyaa Sankar Raman Deployment Task #23590: SSR1 Testing 30.00
01/27/2021 Shrividhyaa Sankar Raman Deployment Task #23589: HWR Software Development and Testing 20.00
01/27/2021 Shrividhyaa Sankar Raman Deployment Task #23586: Buy connectors and for connections between HWR and Resonance control chassis. 20.00
01/25/2021 Shrividhyaa Sankar Raman Testing Bug #24879: Network mask for HWR and SSR1 (other?) This has been resolved by setting netmask to 255.255.255.0 16.00
01/25/2021 Shrividhyaa Sankar Raman Testing Feature #24921: Beam Loading Compensation and DAQ modes Refer to Bug 25159 of HWR. 1.00
01/25/2021 Shrividhyaa Sankar Raman Implementation Bug #25159: Beam Synchronization The beam synchronization issue has been resloved 28.00
11/18/2020 Shrividhyaa Sankar Raman Testing Bug #24646: Incorrect values at Pressure Transducer Readback Steps followed to solve this issue. 1.00
11/17/2020 Shrividhyaa Sankar Raman Testing Bug #24646: Incorrect values at Pressure Transducer Readback This issue has been solved 20.00
11/09/2020 Shrividhyaa Sankar Raman Testing Bug #25135: QL measurement plot denotes that the RF is not turned off. 0.00
11/09/2020 Shrividhyaa Sankar Raman Testing Bug #25135: QL measurement plot denotes that the RF is not turned off. 4.00
11/02/2020 Shrividhyaa Sankar Raman Testing Bug #25159: Beam Synchronization 16.00
11/02/2020 Shrividhyaa Sankar Raman Administration Feature #25024: Reference amplitude and phase This has been established in LV. 4.00
10/13/2020 Shrividhyaa Sankar Raman Implementation Feature #24921: Beam Loading Compensation and DAQ modes Beam Synchronization Implemented for HWR Development System. 16.00
10/09/2020 Philip Varghese Development Feature #24921: Beam Loading Compensation and DAQ modes 40.00
10/05/2020 Shrividhyaa Sankar Raman Testing Bug #24878: Labview DAQ is broken, the first 1000 point capture is repeated 20.00
10/05/2020 Shrividhyaa Sankar Raman Testing Bug #24768: Labview tuning parameter negative number issue Issue resolved 5.00
10/05/2020 Shrividhyaa Sankar Raman Deployment Bug #25028: Netmask is not correct Netmask has been changed by adding /24 to end of the IP address int llrf-wired.network document. 26.00
09/04/2020 Shrividhyaa Sankar Raman Design Meeting #24914: HWR Cleanup 0.10
09/01/2020 Philip Varghese Development Bug #24884: Labview gain limits Feedback gain range 4.00
08/31/2020 Brian Chase Analysis Task #24775: Priorities for HWR 0.10
08/14/2020 Shrividhyaa Sankar Raman Development Task #24578: ACNET Connection ACNET Connection Established. 8.00
08/11/2020 Brian Chase Analysis Task #24754: Remove & Repair HWR Pressure loop Signal conditioning chassis Troubleshooting the valve control 0.10
(1-25/71) Per page: 25, 50, 100

Also available in: Atom CSV