Project

General

Profile

Near Detector

Run number and date indicate start of configuration and run to the next date listed.

Updated: Jul 07, 2017 by

Milestones List for Near Detector
Milestone Date Run Number Comments
Epoch ?? (Period ?) begins ??-??-201? 1XXXX ??
Epoch 6a (Period 6) ends 07-07-2017 12289 Summer shutdown 2017 begins
Period 6 (Epoch 6a) begins 02-20-2017 12087 RHC (Anti-Neutrino) mode 2017
Period 5 (Epoch 5b) ends 02-20-2017 12086 End of FHC (Neutrino) mode 2016/2017
Epoch 5b (Period 5) begins 01-10-2017 12029
Epoch 5a (Period 5) ends 01-10-2017 12028
Period 5 (Epoch 5a) begins 11-14-2016 11926 2016/2017 BEAM in Neutrino mode
Period 4 (Epoch 4c) ends 11-14-2016 11925
Epoch 4c (Period 4) begins 11-11-2016 11921 Antineutrino beam after shutdown. Note: R10 DAQ release used with new data format, horn re-aligned
Epoch 4b (Period 4) ends 11-11-2016 11920
Epoch 4b (Period 4) begins 07-29-2016 11668 2016 summer shutdown. DAQ updated to R10 release with new data format.
Period 4 (Epoch 4a) ends 07-29-2016 11667 Short 2016 antineutrino beam
Period 4 (Epoch 4a) begins 06-29-2016 11632 Short 2016 antineutrino beam
Period 3 (Epoch 3e) ends 06-28-2016 11628 End of 2016 NuMI neutrino beam
Epoch 3e (Period 3) begins 05-02-2016 11538
Epoch 3d (Period 3) ends 05-02-2016 11537 Closing run for 2nd analysis dataset
Recycler is off-line Main Injector 04-23-2016 11523 MI is delivering nu beam intensities that are ~ 50 % lower than usual (about 300 kW instead of 600 kW).
Epoch 3d (Period 3) begins 01-20-2016 11384
Epoch 3c (Period 3) ends 01-20-2016 11383
Epoch 3c (Period 3) begins 11-18-2015 11302 BEAM 2015/2016
Epoch 3b (Period 3) ends 11-18-2015 11301
Epoch 3b (Period 3) begins 10-23-2015 11250 BEAM 2015
Epoch 3a (Period 3) ends 10-23-2015 11249
Period 3 (epoch 3a) begins 10-12-2015 11229 Gain 150. NO beam or horn & target scans
Period 2 (epoch 2e) ends 10-12-2015 11228
Epoch 2e (Period 2) begins 07-04-2015 11019 Summer 2015 beam shutdown & start-up
Epoch 2d (Period 2) ends 07-04-2015 11018
Epoch 2d (Period 2) begins 06-08-2015 10974 NuMI Horn scan & NO Horn Current beam
Epoch 2c (Period 2) ends 06-08-2015 10973 End First Analysis dataset
Epoch 2c (Period 2) begins 05-15-2015 10933
Epoch 2b (Period 2) ends 05-15-2015 10932
Epoch 2b (Period 2) begins 03-13-2015 10825 Epoch 2b data may not be included in the First Analysis.
Epoch 2a (Period 2) ends 03-13-2015 10824 End of summer 2014 shutdown and refit
Period 2 (epoch 2a) begins 10-23-2014 10496 Summer 2014 Shutdown and Refit
Period 1 (epoch 1a) ends 09-05-2014 10407 End of commissioning.
Final run pre-shutdown 09-05-2014 10407
ND running in Partition 1 henceforth, Production 08-22-2014 10387 Data in P2 prior to this run.
Period 1 (epoch 1a) begins 08-16-2014 10377 First Analysis. Commissioning.
Cold, full gain, complete detector, data 08-15-2014 10377 Use data prior to this at your own risk. (Partition 2)

Note: Work in progress. Contact

Reference

As a cross check to what production defines as periods and epochs, you can take a look at the link below:
https://cdcvs.fnal.gov/redmine/projects/novaart/wiki/Period_and_Epoch_Naming

Updated: Jul 07, 2017.