Project

General

Profile

12172013 Minutes

Operations

Di-blocks 1 through 5 on partition 1. Everything else on partition 2.
Running warm on di-blocks 3/4/5 which are being cooled today.

Di-block 5 top, DCMS are very noisy.
Siva is working on a check-list for watchdog to look at.

Production

Edited scrips caused reco and beyond to crash. Gavin has fixed this now and
has things running again. Eric F is going to work on processing data through SAM.