10/23/2013 Minutes¶
Attendance¶
Nick, Jan, Michael, Mat, Susan, Kanika, Evan, Dominick (Ok with Dom), Gavin
Operations¶
- End of shift form now has has run synopsis
- dcm-2-02-09: (problems) being swapped (11474 first untangled 2 diblock cold run)
- Diblock 1 is good
- Beam is off all day
Production¶
- Cosmic trigger haven’t been processed for 1 week
- Nick waiting for NDOS to come through
- Gavin says nova pro can get a bogged down queue (can we stagger?)
- Copy latest file with priority
Outstanding Issues:¶
- cosmic trigger crash issue
- major fix in the working to CAF Floating Point Exception
- We need a scheme to get this rolling (Branches)