Project

General

Profile

05022014 Minutes

Attending - Micheal, Evan, Mat (Cameo by Jim)

-FD running well
Hits per sill dropping (period drops in this metric at shift changes)

-NDOS
Poor timing peak
Average plane cell look terrible (small active detector)

Updated the Milestones page.