Project

General

Profile

03072014 Minutes

Attending: Michael, Mat, Siva, Pavan, Dom, Gavin

Checklists are in progress. Watchdog added to DAQ/Computing.

2 water leak in the past day. Diblock 7 cold.

3:15 am - DAQ crash (RC problems)

P1
Slice Time Duration looks unusual after, and Track length was large after the leak and shrank. (We're firing up an EVD to look)

P2
Looks like a misconfiguration in the HV for 4 hours.

P3
Hits/spill stable over the week.
Midnight drop out of feb.

Now list making.