02172014 Minutes

Operation:
- Partition 1 -
Diblock 3 is added to partition 1 at run 13197.

Average plane cell plot - Horizontal strips this weekend. Partition 2 config was applied to Partiton 1 after a crash which caused the wrong config to (log 32077)

Sunday - spill server was disrupted for a 2 hour of NUMI period.

Last 1:20 - Data logger failure last night on partition 1, took 2 hours to recover

Funny ADC distribution still - Need DSO scan?

Michael is working on the Nearline checklist, Gavin and Jose and on shift and can look at the check list.

Partition 3 DAQ testing.

Parition 2 - increase in hits per spill.