Project

General

Profile

Running Conditions » History » Version 71

« Previous - Version 71/79 (diff) - Next » - Current version
Michael Wallbank, 01/21/2021 08:40 AM
Add last night's 1e9ppp running


Running Conditions

Period 3 (January 2021 -- )

Date Conditions Detector Run # Beamline Run # Comments
Beam Intensity Beamline Trigger Secondary Momentum Secondary Collimator Tertiary Momentum Detector Firmware Other
January 12 ~1e9ppp Paddles 4-of-4 64 GeV 14mm 1 kA v4.10.2E 100985 3622 Very first data, no beam tuning performed yet
January 19 ~5e8ppp Paddles 4-of-4 64 GeV 14mm 1 kA v4.10.2E 101013 3654 Still little tuning, relatively unstable beam
January 19 ~1e8ppp Paddles 4-of-4 64 GeV 14mm 1 kA v4.10.2E 101014 3656
January 20 ~1e9ppp Paddles 4-of-4 64 GeV 14mm 1 kA v4.10.2E 101022 3656 (Beamline run never stopped)

Period 2b-f (December 2019 -- March 2020)

Period 2a (December 2019)

Period 1 (May -- July 2019)

Also see: https://docs.google.com/spreadsheets/d/1kUI1HRDhCQWzimxRcGTcgThaRhS2VXPaaW3TXKHmLLo/edit#gid=0