Commissioning Runs » History » Version 4

« Previous - Version 4/246 (diff) - Next » - Current version
Varun Raj, 05/11/2019 04:35 PM


Commissioning runs

Below is a running list of commissioning runs.

UP TO DATE AS OF 2019-05-10

Start Date | Run   | Num. files | Trigger Pattern                | Current | Dig. Freq. |Notes
-----------+-------+------------+--------------------------------+---------+------------+---------------------------------------------
2019-05-04 | 2729  | 10         | WC scintillator panels         | 1000 A? | 5   GHz    | Run ended with beam off due to klystron
           |       |            | off: DIGBUSY                   |         |            | issues at Linac.
-----------+-------+------------+--------------------------------+---------+------------+---------------------------------------------
2019-05-05 | 2730  | 16         | WC scintillator panels         | 1000 A? | 5   GHz    | Magnet current readout issues begun. Beam 
           |       |            | off: DIGBUSY                   |         |            | downtime at end of run.
-----------+-------+------------+--------------------------------+---------+------------+---------------------------------------------
2019-05-06 | 2733  | 4          | WC scintillator panels         | 1000 A? | 5   GHz    | 
           |       |            | off: DIGBUSY                   |         |            | 
-----------+-------+------------+--------------------------------+---------+------------+---------------------------------------------
2019-05-06 | 2734  | 2          | WC scintillator panels         | 2000 A  | 5   GHz    | Test at 2000 A 
           |       |            | off: DIGBUSY                   |         |            | 
-----------+-------+------------+--------------------------------+---------+------------+---------------------------------------------
2019-05-07 | 2735  | 7          | WC scintillator panels         | 500 A   | 5   GHz    | Test at 500 A (M1 Ref)
           |       |            | off: DIGBUSY                   |         |            | 
-----------+-------+------------+--------------------------------+---------+------------+---------------------------------------------
2019-05-07 | 2737  | 11         | WCCOINC MWPCOFF SWYDGATE (M=3) | 2000 A  | 5   GHz    | Run killed after MessageViewer froze
           |       |            | off: DIGBUSY                   |         |            | 
-----------+-------+------------+--------------------------------+---------+------------+---------------------------------------------
2019-05-08 | 2749  | 16         | WC1 - WC4 MWPCOFF SWYDGATE     | 2000 A  | 5   GHz    | WC2 had a HV trip. Near the end of the run, 
           |       |            | off: DIGBUSY                   |         |            | TDU RPC returned false error.
-----------+-------+------------+--------------------------------+---------+------------+---------------------------------------------
2019-05-09 | 2753  | 2          | WC1 - WC4 MWPCOFF SWYDGATE     | 2000 A  | 2.5 GHz    | First run at 2.5 GHz. Run stopped to do 
           |       |            | off: DIGBUSY                   |         |            | controlled access (ECL @610)
-----------+-------+------------+--------------------------------+---------+------------+---------------------------------------------
2019-05-09 | 2754  | 15         | WC1 - WC4 MWPCOFF SWYDGATE     | 2000 A  | 2.5 GHz    | 
           |       |            | off: DIGBUSY                   |         |            | 
-----------+-------+------------+--------------------------------+---------+------------+---------------------------------------------
2019-05-10 | 2763  | 3          | WCCOINC MWPCOFF SWYDGATE (M=4) | 1000 A  | 2.5 GHz    | First of three short runs to test the
           |       |            | off: DIGBUSY                   |         |            | M-of-4 coincidence logic. (ECL @656)
-----------+-------+------------+--------------------------------+---------+------------+---------------------------------------------
2019-05-10 | 2764  | 3          | WCCOINC MWPCOFF SWYDGATE (M=3) | 1000 A  | 2.5 GHz    | Second to test M-of-4 coincidence logic
           |       |            | off: DIGBUSY                   |         |            | 
-----------+-------+------------+--------------------------------+---------+------------+---------------------------------------------
2019-05-10 | 2765  | 3          | WC1 - WC4 MWPCOFF SWYDGATE     | 1000 A  | 2.5 GHz    | Last of three runs to test the M-of-4
           |       |            | off: DIGBUSY                   |         |            | coincidence logic
-----------+-------+------------+--------------------------------+---------+------------+---------------------------------------------
2019-05-11 | 2766  | 8          | WC scintillator panels         | 1000 A  | 2.5 GHz    | Run ended after beam stopped.
           |       |            | off: DIGBUSY                   |         |            | 
-----------+-------+------------+--------------------------------+---------+------------+---------------------------------------------