Beam Wire chambers » History » Version 7
« Previous -
Version 7/13
(diff) -
Next » -
Current version
Andrew Sutton, 11/15/2019 01:54 PM
Beam Wire chambers¶
We have two chambers used to monitor the secondary beam.
Almost everything at Wire Chambers applies to the beam chambers .
- placed just downstream of LArIAT in a break in the beam pipe
- HV setting:
- Controller: ftbfwc02
- placed just before the NOvA target in MC7
- HV setting:
- Controller: ftbfwc07