We have two chambers used to monitor the secondary beam

Upstream chamber
  • placed just downstream of LArIAT in a break in the beam pipe
  • Controller: ftbfwc02
Target chamber
  • placed just before the NOvA target in MC7
  • Controller: ftbfwc07

Almost everything at Wire Chambers applies to the beam chambers