h1. Beam Wire chambers

We have two chambers used to monitor the secondary beam
One is placed just downstream of LArIAT in a break in the beam pipe
* Controller: ftbfwc02

The other is placed just before the NOvA target in MC7
* Controller: ftbfwc07