Andrew Sutton, 11/15/2019 01:52 PM


Beam Wire chambers

We have two chambers used to monitor the secondary beam
One is placed just downstream of LArIAT in a break in the beam pipe
  • Controller: ftbfwc02
The other is placed just before the NOvA target in MC7
  • Controller: ftbfwc07

Almost everything at Wire Chambers applies to the beam chambers