Project

General

Profile

ACNET Addresses

Experiment page E108 in ACNET.

Scaler Module

Mapping as of 1/29/2020:

All reset every spill.
Z:NOVTSC   - Basic status of SIS 3800 Scaler board
-------------------------------------------------------------------------------------------------
Z:NOVTSC00 - Target scintillators 2-3-4 coincidence
Z:NOVTSC01 - Target scintillator 1
Z:NOVTSC02 - MWPC-1 pulses
Z:NOVTSC03 - MWPC-2 pulses
Z:NOVTSC04 - MWPC-3 pulses
Z:NOVTSC05 - MWPC-4 pulses
Z:NOVTSC06 - Cherenkov PMT pulses
Z:NOVTSC07 - Beamline DAQ trigger

Z:NOVTSC08 - 10.3 Hz counter (Philips pocket pulser) used for the Synoptic "Progress Indicators" 
Z:NOVTSC09 - Target wire counter
Z:NOVTSC10 - Paddle-1
Z:NOVTSC11 - Paddle-2
Z:NOVTSC12 - Paddle-3
Z:NOVTSC13 - Paddle-4
Z:NOVTSC14 - Target wire chamber
Z:NOVTSC15 - ToF 3-of-4 DS-SiPM
-----------------------------------------------------------  34 pin Flat Ribbon Cable ---------- A
Z:NOVTSC16 - Muon-1 Scintillator
Z:NOVTSC17 - Muon-2 Scintillator
Z:NOVTSC18 - Muon-3 Scintillator
Z:NOVTSC19 - Muon-4 Scintillator
Z:NOVTSC20 - L-1 roaming scintillator
Z:NOVTSC21 - L-2 roaming scintillator
Z:NOVTSC22 - L-3 roaming scntillator
Z:NOVTSC23 - ToF 3-of-4 US

Z:NOVTSC24 - Shield-1 Scintillator
Z:NOVTSC25 - Shield-2 Scintillator
Z:NOVTSC26 - Shield-3 Scintillator
Z:NOVTSC27 - Shield 1&2 Coincidence
Z:NOVTSC28 - Beam-1 Scintillator
Z:NOVTSC29 - Beam-2 Scintillator
Z:NOVTSC30 - Beam-3 Scintillator
Z:NOVTSC31 - ToF 3-of-4 DS
---------------------------------------------------------- 34 pin Flat Ribbon Cable ------------ B

Magnet

F:MC7AN2  - M1 Dipole Current
F:MC7AN2F - M1 Dipole REference current

E:C2APR1  - MC7b M1 H2O Return Flow
E:C2APR2  - MC7b M1 H2O Supply Pressure
E:C2APR3  - MC7b M1 H2O Return Pressure

E:C2TC01  - MC7b M1 H2O Supply Temperature
E:C2TC02  - MC7b M1 H2O Return Temperature

E:MC7AT1  - M1 Magnet Coil Temperature
E:MC7AT2  - M1 Magnet Yoke Temperature

E:C2TC03  - M1 Top Coil Top Layer Temp Downstream
E:C2TC04  - M1 Bot Coil Top Layer Temp Downstream
E:C2TC07  - M1 Top Coil Top Layer Temp Upstream
E:C2TC09  - M1 Top Coil middle Temp

Power Supplies

E:TBLMMS  - MainSwitch
E:TBHVMS  - DiBlockTBHV MainSwitch

L:TB01    - TB 01 UO PW.S - source voltage
L:TB02    - TB 02 UO PW.S - source voltage
L:TB03    - TB 03 UO PW.S - source voltage

M:TB01    - TB 01 U1 PW.S - source voltage
M:TB02    - TB 02 U1 PW.S - source voltage
M:TB03    - TB 03 U1 PW.S - source voltage

H:TB01    - TB 01 HV UO - source voltage
H:TB02    - TB 02 HV UO - source voltage
H:TB03    - TB 03 HV UO - source voltage
L:TB01MV  - TB UO M.Volt    - meas. voltage
L:TB01MC  - TB UO PW.M.Curr - meas. current
L:TB01TP  - TB UO PW.M.TEMP - temperature
L:TB01CF  - TB UO PW.M.CNFG
L:TB02MV  - TB UO M.Volt    - meas. voltage
L:TB02MC  - TB UO PW.M.Curr - meas. current
L:TB02TP  - TB UO PW.M.TEMP - temperature
L:TB02CF  - TB UO PW.M.CNFG
L:TB03MV  - TB UO M.Volt    - meas. voltage
L:TB03MC  - TB UO PW.M.Curr - meas. current
L:TB03TP  - TB UO PW.M.TEMP - temperature
L:TB03CF  - TB UO PW.M.CNFG

M:TB01MV  - TB UO M.Volt    - meas. voltage
M:TB01MC  - TB UO PW.M.Curr - meas. current
M:TB01TP  - TB UO PW.M.TEMP - temperature
M:TB01CF  - TB UO PW.M.CNFG
M:TB02MV  - TB UO M.Volt    - meas. voltage
M:TB02MC  - TB UO PW.M.Curr - meas. current
M:TB02TP  - TB UO PW.M.TEMP - temperature
M:TB02CF  - TB UO PW.M.CNFG
M:TB03MV  - TB UO M.Volt    - meas. voltage
M:TB03MC  - TB UO PW.M.Curr - meas. current
M:TB03TP  - TB UO PW.M.TEMP - temperature
M:TB03CF  - TB UO PW.M.CNFG

H:TB01MV  - TB HV MM    - meas. voltage
H:TB01MC  - TB HV UO MC - meas. current
H:TB01TP  - TB HV UO TP - temperature
H:TB01CF  - TB HV UO CF
H:TB02MV  - TB HV MM    - meas. voltage
H:TB02MC  - TB HV UO MC - meas. current
H:TB02TP  - TB HV UO TP - temperature
H:TB02CF  - TB HV UO CF
H:TB03MV  - TB HV MM    - meas. voltage
H:TB03MC  - TB HV UO MC - meas. current
H:TB03TP  - TB HV UO TP - temperature
H:TB03CF  - TB HV UO CF

Environmental Sensors

E:C2TC16  - Hall Temperature at East Wall PLC

PLC Dry Gas and Water System

E:NTTT62  - Hall temperature 
E:NTAMT61 - Hall dewpoint
E:NTLT60  - Chiller reservoir level
E:NTTE57  - Water temperature
E:NTPT56  - Water pressure
E:NTAMT09 - Dry gas input dewpoint
E:NTAMY25 - Dry gas output dewpoing
E:NTPT17  - Dry gas system pressure
E:NTPT23  - APD supply pressure
E:NTPT27  - APD return pressure
E:NTFLOW  - Calculated flow rate of dry gas system

Unassigned Devices (ACNET devices with no hardware)

Yagmur's notes are included.

UPSTREAM PLC (East Wall)

E:C2TC05     - No intended target
E:C2TC06     - No intended target
E:C2TC08     - Coil Temp?
E:C2TC10     - Channel may be fried
E:C2TC11-15  - Coil Temps? Rack Temps?
E:C2TC45-48  - Rack Temps?

DOWNSTREAM PLC (Networking Rack)

E:C8RTD1-8   - Detector Temps? 

Unconnected Hardware (hardware with no ACNET devices)
Yagmur's notes are included.

UPSTREAM PLC

WC5 HV, current and status (3 ch; can go downstream)
Cow for beam telescope PMT HV (3 ch?) (1 V/kV, +-2.5V ADC should be OK)
Humidity Sensor upstream (Install next to hall temp?)
Magnet field sensors (Optional low-resolution analog)

DOWNSTREAM PLC

Humidity sensors (2 ch; 1-2 on/under/around detector, build cables)
Cherenkov gas pressure at panel (Existing 4-20 mA output sensor)
Cherenkov gas pressure at detector (Buy 4-20 mA sensor (or use voltage output sensor in hand))
Cherenkov HV (Need to build/find attenuator box (3 kV supply))
WC12 voltage (2 ch), current (2 ch), status (1 V/kV, 10 V/mA, opencollector TTL, need cables)
WC34 voltage (2 ch), current (2 ch), status (1 V/kV, 10 V/mA, opencollector TTL, need cables)
Cow for ToF PMT HV (8 ch?) (1 V/kV on D25 connector, need cable)
RPS status? (Only if PLC goes on unswitched power, need cable)
NIM bin PS status (Check if modules exist)