Attending: Zukai, Thomas, Art, Junting, Leon, Jan, Peter

Power outage leads to additional FCC downtime:
-Halon Fire system fired -> Most central services
-Leon: was able to badge in at 10:15
-25 more APD installs today
-12; 9 parylene, 3 silicone installed last week
-Jan: Data check - no data to check
: DCS_REPORT replication failed twice, erased offline and is replicating the entire table
-Zukai's noise study: The cold scans need to be redone (Thursday)

-DAQ Software: Building HEAD off software.Including DAQ data format and ChannelMap
-Integration: Trigger test. More dumps. Hours worth of detector data across detector.