Following are the sequences need to be followed in order to put the DCM/FEB into a working mode (DCS, DSO, etc.). There are two levels of the diagram for each sequence, first one is in the upper level where each step corresponds to a DCMUtil function call. The second one is a detailed diagram reveals all the underlying steps done by the DCMUtil.

Dual-Correlation Sampling Mode (DCS mode)

Sketched diagram

Qiming Lu, 01/11/2011

Sketched diagram updated 01/13/2011 (DCMUtil.cpp r139 in cvs, changes in yellow boxes)

Qiming Lu, 01/13/2011

Detailed sequence diagram

Qiming Lu, 01/11/2011

Detailed sequence diagram updated 01/13/2011 (DCMUtil.cpp r139 in cvs, changes in yellow boxes)