Project

General

Profile

Third analysis todo list » History » Version 8

« Previous - Version 8/59 (diff) - Next » - Current version
Louise Suter, 03/09/2016 12:28 PM


Third analysis todo list

This is supposed to be a list of all the things that we ought to have done for 2nd ana but deferred. I'm sure this list will continue to grow. Please help to keep it up to date.

  • Update genie to pick up latest MEC models
  • Update geant to pick up new neutron simulation
  • Update to new noise model
  • Update timing fit to new pulse shape parametrization, optimize parameters
  • Update ReadoutSim parameters based on best info from data parameter tuning
  • Investigate size improvements from CellHit pointing to RawDigit
  • Develop data-based threshold corrections in calibrations
  • Drift calibrations
  • Detector alignment
  • Switch to HoughVertex
  • Generate new LEM library with GeVs
  • Remove all traces of PECorr outside the calibration itself
  • Get all plots into automated validation system
  • Tests for new calibcsvs releases/calibrator code
  • Update defman for new naming schemes/metadata, teach it about decafs
  • DQ should add horn-current-study runs into list of bad runs removed manually (instead of removing all runs that week).