h1. 14-Feb-2019
2 1 Ryan Rivera
3 1 Ryan Rivera
4 1 Ryan Rivera
Agenda:
5 1 Ryan Rivera
1. General status updates and schedule review
6 1 Ryan Rivera
Glenn -- thinking about rack monitor box address assignment, and how we can use SD card. Going to reach out to Jason for testing at the test stand.
7 1 Ryan Rivera
8 1 Ryan Rivera
Tomo -- working on CRV data format running with package compatibility -- targeting collaboration meeting
9 1 Ryan Rivera
10 1 Ryan Rivera
Dariush and Stefano -- want to flesh out Calorimeter ROC details and slow controls PVs. Franco is coming soon. Dariush here for two weeks.
11 1 Ryan Rivera
12 1 Ryan Rivera
Greg -- integration team is happy with sync approach. Thinking about verifying chain CFO-DTCS[0:9]-ROC.. We want timestamping kits in DAQ room. And timestamping in DTC. Could take emulator ROC data in run data at something like 1 Hz. Repositories created for all detectors.
13 1 Ryan Rivera
14 1 Ryan Rivera
Jose -- place and routing now. Would like simulation help on what the DTC will send with new DCS format (single and double read, save block read for later).
15 1 Ryan Rivera
16 1 Ryan Rivera
Rick -- STM firmware ready. DCS changes introduced a bug into DTC - looking at.. John is getting a lot of quotes for fiber plant. Draka fiber order is on hold.. Gary is working on green light questions. STM limiting factor is we dont have timing cards. 
17 1 Ryan Rivera
18 1 Ryan Rivera
Eric -- software updates for base packages.. artdaq and ots new releases out. Bug in artdaq release (that does not effect Mu2e).. Should be a new release next week or so. Req for 5 servers seems to be stalled.
19 1 Ryan Rivera
20 1 Ryan Rivera
 
21 1 Ryan Rivera
22 1 Ryan Rivera
23 1 Ryan Rivera
2. Timing distribution demonstration updates
24 1 Ryan Rivera
3. online Trigger Processing (including through DTC) progress/plans 
25 1 Ryan Rivera
4. Status of tests with detector subsystems
26 1 Ryan Rivera
5. Rack protection & slow controls progress/plans (dedicated DCS node at FCC)