1 1 Ryan Rivera
h1. 12-Oct-2017
2 1 Ryan Rivera
3 1 Ryan Rivera
Agenda:
4 1 Ryan Rivera
1. General status updates/Schedule 
5 1 Ryan Rivera
John - still working on optical links work before switching to characterizing mu2e timing card. Rick made firmware changes for his tests.
6 1 Ryan Rivera
Eric - DTC interface library documented “completely” .. has firmware version check. DCS attempt in 1st rack: on DCS private network = nodes, PDUs (not configured: IP address,username), beaglebone (temperature probe, smoke detector, fan speed). Waiting on Dave Huffman to finish 90deg plug.
7 1 Ryan Rivera
Gennadiy - mu2edaq11 trying to compile latest online software.
8 1 Ryan Rivera
Ron - testing new firmware from Rick - turned out to be (not) driver/library. Put new sw/fw on mu2edaq05 and Tomo had problems, but likely didnt upgrade interface library.
9 1 Ryan Rivera
Rick - fixed problem with DMA stopping for no reason. More CRV testing with Sten - packets in both directions (requesting data and response). Merging the changes from both firmware forks. Calorimeter folks are asking for help. Partial reconfiguration license cost?
10 1 Ryan Rivera
Order 7 https://www.digikey.com/product-detail/en/micron-technology-inc/MT8KTF51264HZ-1G9P1/557-1767-ND/5956640
11 1 Ryan Rivera
9 = 1 Rick’s office + 1 Calorimeter + 6 Pilot  + 1 (float)
12 1 Ryan Rivera
1 = CFO
13 1 Ryan Rivera
Start looking at placeholder for Ethan’s code.
14 1 Ryan Rivera
Glenn - looking at PDU connection. 
15 1 Ryan Rivera
 
16 1 Ryan Rivera
2. Rack CRR status
17 1 Ryan Rivera
3. Internal review preparation status
18 1 Ryan Rivera
In two weeks!
19 1 Ryan Rivera
4. DTC Testing: CRV Testing. Event Building testing.
20 1 Ryan Rivera
5. online Trigger Processing (including through DTC) progress/plans (highest priority)
21 1 Ryan Rivera
6. Rack protection & slow controls progress/plans (can we monitor PDU in Mu2e building?)