09-May-2019 » History » Version 1

Ryan Rivera, 05/09/2019 01:34 PM

1 1 Ryan Rivera
h1. 09-May-2019
2 1 Ryan Rivera
3 1 Ryan Rivera
4 1 Ryan Rivera
5 1 Ryan Rivera
Agenda:
6 1 Ryan Rivera
1. General status updates/Schedule review
7 1 Ryan Rivera
8 1 Ryan Rivera
Eric -- DTC interface library now waits for a “ready” state after changing the CFO emulator status. Added a device lockout mechanism to pcie driver. Now, do not instantiate CFO with DTC lib. Artdaq release is in testing right now. The new otsdaq release to follow for e17 and Offline compatibility.
9 1 Ryan Rivera
10 1 Ryan Rivera
Jose -- working with Erdem and Vadim on STM ROC and Tracker ROC. Found an issue with DCS Read Block request 100 words error found bug. Added Data Request features.
11 1 Ryan Rivera
12 1 Ryan Rivera
Rick -- trying to get back to testing stress test. Has a “prehistoric” CRV ROC used for compatibility testing. Updated DTC user manual in docdb -- register map etc..
13 1 Ryan Rivera
14 1 Ryan Rivera
Tomo -- Merged packet simulation and processing code into head of Offline… which includes generating artdaq fragments from digis, and converting back to digis. 
15 1 Ryan Rivera
16 1 Ryan Rivera
Bertrand -- Optimizing trigger filters (and being busy). Wants to discuss the plan for online monitoring, and get more people involved in customizing otsdaq for Mu2e.
17 1 Ryan Rivera
18 1 Ryan Rivera
Glenn -- EPICS pv gateway is allowing remote clients well (with some security options). All the networks we are developing now seem to be able to see each other. Currently using ssh tunnels, but should just open TCP ports probably. Would like to start having dedicated DCS meetings (9am Thursdays).. Currently talking with Ext Monitor people.
19 1 Ryan Rivera
20 1 Ryan Rivera
Ryan -- Timing Card purchase in production. Purchasing happy Firefly order req. Holding pattern for req fo DTC cards.
21 1 Ryan Rivera
22 1 Ryan Rivera
23 1 Ryan Rivera
24 1 Ryan Rivera
2. Test stand status (including NFS and RAID discussion)
25 1 Ryan Rivera
26 1 Ryan Rivera
mu2edaq13 will get RAID.. not started yet. Will impact performance while this happening.
27 1 Ryan Rivera
28 1 Ryan Rivera
29 1 Ryan Rivera
3. online Trigger Processing (including through DTC) progress/plans 
30 1 Ryan Rivera
4. Status of tests with detector subsystems
31 1 Ryan Rivera
32 1 Ryan Rivera
STM and Tracker ROC firmware ongoing. Tracker aborted their test beam.
33 1 Ryan Rivera
34 1 Ryan Rivera
5. DCS/EPICS Rack protection & slow controls progress/plans