Project

General

Profile

REMOTE » History » Version 7

Arthur Kreymer, 06/07/2013 10:09 PM

1 1 Arthur Kreymer
h1. REMOTE MINOS+ STATIONS REQUIREMENTS AND POLICIES
2 1 Arthur Kreymer
3 1 Arthur Kreymer
Notes underlined show topics that need discussion, improvement or maybe a complete change.
4 1 Arthur Kreymer
5 1 Arthur Kreymer
Notes with *bold font*  shows the significant differences between
6 2 Stefano Tognini
 docDB 7789-v4 (Remote MINOS Shifts - Brett Viren, Rob Plunkett and Benton Pahlka) and this documentation.
7 1 Arthur Kreymer
8 1 Arthur Kreymer
h2. INTRODUCTION
9 1 Arthur Kreymer
10 2 Stefano Tognini
A remote MINOS station can save effort and funds of different institutions by providing a possibility to the collaboration to take shifts remotely. Since shifters rarely are in physical contact with the detectors and all duties are done by networked applications, a remote shift has almost no lacks comparing to a local shift. This document provides the hardware and software requirements to set a remote shift station from the ground up and defines the requirements, certification and policies for MINOS+ Remote Stations.
11 1 Arthur Kreymer
12 3 Stefano Tognini
h2. HARDWARE REQUIREMENTS, INSTALLATION AND CONFIGURATION
13 1 Arthur Kreymer
14 4 Arthur Kreymer
The Control Room software and the necessary steps to configure a Remote MINOS+ Station are documented in the 
15 4 Arthur Kreymer
"REMOTE STATION WIKI":https://cdcvs.fnal.gov/redmine/projects/remotestation/wiki
16 1 Arthur Kreymer
17 1 Arthur Kreymer
18 1 Arthur Kreymer
h2. REMOTE SHIFT LIMITATIONS
19 1 Arthur Kreymer
20 2 Stefano Tognini
On remote shifts some tasks will be different or missing comparing to a local shift. The first is that there is no possibility to manage the keys for going underground on the Near Detector Hall. Since this duty is shared with MINERvA, it will be delegated to them during remote shifts or, otherwise, this will not be performed. Also, ACNET beam plots will not be made. The choice was made by weighting the technical challenge against their importance and the ease of which experts can perform them.
21 1 Arthur Kreymer
22 1 Arthur Kreymer
h2. CERTIFYING A NEW RMS
23 1 Arthur Kreymer
24 6 Arthur Kreymer
In order to be an official RMS, the institution's remote station must fulfill the requirements of 
25 6 Arthur Kreymer
"DocDB 9842":https://minos-docdb.fnal.gov:440/cgi-bin/ShowDocument?docid=9842
26 2 Stefano Tognini
27 1 Arthur Kreymer
* Have technical resources to configure and maintain the remote station.
28 1 Arthur Kreymer
* Be committed to making the station available for collaborators from outside the hosting institution for their own remote shifts.
29 6 Arthur Kreymer
* Successfully complete three shadow shifts.
30 1 Arthur Kreymer
* An informal report describing issues (if any) found during the shift should be given to
31 2 Stefano Tognini
the run coordinators and other interested parties.
32 1 Arthur Kreymer
33 7 Arthur Kreymer
The fulfillment of the afore mentioned requirements certifies the RMS for official remote shifts.
34 7 Arthur Kreymer
The certified stations are :
35 7 Arthur Kreymer
| STATION | DATE |
36 7 Arthur Kreymer
| GOIAS   | 2013-05-27 |
37 2 Stefano Tognini
38 2 Stefano Tognini
39 1 Arthur Kreymer
h2. SHIFTER TRANSITION
40 1 Arthur Kreymer
41 2 Stefano Tognini
Local shifts have an informal procedure for shift hand-off. The new shifter should be updated with some current issues (if any), the current status of the experiment and if someone is performing some tasks underground. This should be done during shift hand-off for remote shifts as well.
42 1 Arthur Kreymer
43 1 Arthur Kreymer
* The oncoming remote shifter calls the current local (or remote) shifter before the end of
44 1 Arthur Kreymer
the current shift to discuss the status of the experiment. It is strongly recommended that
45 1 Arthur Kreymer
the oncoming shifter also checks the Logbook and the Memopad. (Ignore this step if there was
46 1 Arthur Kreymer
no previous shift, but checking the Logbook and MemoPad before the start of the shift is
47 1 Arthur Kreymer
strongly recommended and could avoid some problems.)
48 1 Arthur Kreymer
* The oncoming remote shifter must ensure that the remote shift contact information is
49 1 Arthur Kreymer
prominently displayed in the MINOS+ Control Room.
50 1 Arthur Kreymer
*A note in the Logbook informing the start of a remote shift with the remote station's
51 1 Arthur Kreymer
name, the remote shifter's name and its contact should be done.*
52 1 Arthur Kreymer
* The MINERvA shifter must be informed that a remote MINOS+ shift is starting.
53 1 Arthur Kreymer
* The MINERvA shifter must inform the Main Control Room (MCR) that they are now the NuMI contact.
54 1 Arthur Kreymer
* +The 2 steps in italic above should be removed, since NOvA is now responsible for
55 1 Arthur Kreymer
the NuMI.+
56 1 Arthur Kreymer
57 1 Arthur Kreymer
On end shift hand-off, the steps are reversed:
58 1 Arthur Kreymer
59 1 Arthur Kreymer
Oncoming local (or remote) shifter must call the Remote MINOS+ Station before the end of
60 1 Arthur Kreymer
the shift in order to be updated with the status of the experiment.\
61 1 Arthur Kreymer
* The remote shift announce must be removed from the MINOS+ Control Room display.\
62 1 Arthur Kreymer
* *The remote shifter should state, in the Logbook, that the remote shift has ended.*
63 1 Arthur Kreymer
* If the new shifter is a local shifter, then the Main Control Room must be informed that MINOS+ is the current NuMI contact.
64 1 Arthur Kreymer
+The step in italic should be removed,  since NOvA is now responsible for the
65 1 Arthur Kreymer
NuMI+