Project

General

Profile

REMOTE » History » Version 3

Stefano Tognini, 05/28/2013 10:58 AM

1 1 Arthur Kreymer
h1. REMOTE MINOS+ STATIONS REQUIREMENTS AND POLICIES
2 1 Arthur Kreymer
3 1 Arthur Kreymer
Notes underlined show topics that need discussion, improvement or maybe a complete change.
4 1 Arthur Kreymer
5 1 Arthur Kreymer
Notes with *bold font*  shows the significant differences between
6 2 Stefano Tognini
 docDB 7789-v4 (Remote MINOS Shifts - Brett Viren, Rob Plunkett and Benton Pahlka) and this documentation.
7 1 Arthur Kreymer
8 1 Arthur Kreymer
h2. INTRODUCTION
9 1 Arthur Kreymer
10 2 Stefano Tognini
A remote MINOS station can save effort and funds of different institutions by providing a possibility to the collaboration to take shifts remotely. Since shifters rarely are in physical contact with the detectors and all duties are done by networked applications, a remote shift has almost no lacks comparing to a local shift. This document provides the hardware and software requirements to set a remote shift station from the ground up and defines the requirements, certification and policies for MINOS+ Remote Stations.
11 1 Arthur Kreymer
12 1 Arthur Kreymer
13 3 Stefano Tognini
h2. HARDWARE REQUIREMENTS, INSTALLATION AND CONFIGURATION
14 1 Arthur Kreymer
15 2 Stefano Tognini
The Control Room software and the necessary steps to configure a Remote MINOS+ Station are available in a centralized and online page (link below). This guarantee that the software is always available and the documentation used to set it up is up to date.
16 1 Arthur Kreymer
17 2 Stefano Tognini
> https://cdcvs.fnal.gov/redmine/projects/remotestation/wiki
18 1 Arthur Kreymer
19 1 Arthur Kreymer
20 1 Arthur Kreymer
h2. REMOTE SHIFT LIMITATIONS
21 1 Arthur Kreymer
22 2 Stefano Tognini
On remote shifts some tasks will be different or missing comparing to a local shift. The first is that there is no possibility to manage the keys for going underground on the Near Detector Hall. Since this duty is shared with MINERvA, it will be delegated to them during remote shifts or, otherwise, this will not be performed. Also, ACNET beam plots will not be made. The choice was made by weighting the technical challenge against their importance and the ease of which experts can perform them.
23 1 Arthur Kreymer
24 1 Arthur Kreymer
h2. CERTIFYING A NEW RMS
25 1 Arthur Kreymer
26 2 Stefano Tognini
In order to be an official RMS, the institution's remote station must fulfill some requirements:
27 2 Stefano Tognini
28 1 Arthur Kreymer
* Have technical resources to configure and maintain the remote station.
29 1 Arthur Kreymer
* Be committed to making the station available for collaborators from outside the hosting institution for their own remote shifts.
30 1 Arthur Kreymer
* Successfully complete two (uncounted) test shifts by two different people, concurrent with a local shift (at FNAL). 
31 1 Arthur Kreymer
At least one uncounted shift must be performed by one who is not directly involved in configuring and maintaining the RMS.
32 2 Stefano Tognini
** +The condition above may be changed to:
33 2 Stefano Tognini
- Successfully complete two (uncounted) test shifts concurrent with a local shift (at FNAL). Removing the condition of doing shifts with 2 different people will allow that Universities with only ONE researcher can be defined as an official RMS. The same person will configure the RMS, maintain it and do the necessary shifts.+
34 1 Arthur Kreymer
* An informal report describing issues (if any) found during the shift should be given to
35 1 Arthur Kreymer
the run coordinators and other interested parties.
36 1 Arthur Kreymer
37 2 Stefano Tognini
he fulfillment of the fore mentioned requirements certifies the RMS for official remote shifts. A list with the officially maintained MINOS+ remote stations can be found in the Remote MINOS+ Station's Wiki and in the Remote section in the MemoPad:
38 1 Arthur Kreymer
https://cdcvs.fnal.gov/redmine/projects/remotestation/wiki
39 1 Arthur Kreymer
40 2 Stefano Tognini
+Stefano's note: If the wiki gets moved to the Memopad, than the last paragraph will just mention that the officially maintained MINOS+ remote stations can be found in the section "List of officially maintained MINOS+ remote stations"+
41 2 Stefano Tognini
42 1 Arthur Kreymer
h2. SHIFTER TRANSITION
43 1 Arthur Kreymer
44 2 Stefano Tognini
Local shifts have an informal procedure for shift hand-off. The new shifter should be updated with some current issues (if any), the current status of the experiment and if someone is performing some tasks underground. This should be done during shift hand-off for remote shifts as well.
45 1 Arthur Kreymer
46 1 Arthur Kreymer
* The oncoming remote shifter calls the current local (or remote) shifter before the end of
47 1 Arthur Kreymer
the current shift to discuss the status of the experiment. It is strongly recommended that
48 1 Arthur Kreymer
the oncoming shifter also checks the Logbook and the Memopad. (Ignore this step if there was
49 1 Arthur Kreymer
no previous shift, but checking the Logbook and MemoPad before the start of the shift is
50 1 Arthur Kreymer
strongly recommended and could avoid some problems.)
51 1 Arthur Kreymer
* The oncoming remote shifter must ensure that the remote shift contact information is
52 1 Arthur Kreymer
prominently displayed in the MINOS+ Control Room.
53 1 Arthur Kreymer
*A note in the Logbook informing the start of a remote shift with the remote station's
54 1 Arthur Kreymer
name, the remote shifter's name and its contact should be done.*
55 1 Arthur Kreymer
* The MINERvA shifter must be informed that a remote MINOS+ shift is starting.
56 1 Arthur Kreymer
* The MINERvA shifter must inform the Main Control Room (MCR) that they are now the NuMI contact.
57 1 Arthur Kreymer
* +The 2 steps in italic above should be removed, since NOvA is now responsible for
58 1 Arthur Kreymer
the NuMI.+
59 1 Arthur Kreymer
60 1 Arthur Kreymer
On end shift hand-off, the steps are reversed:
61 1 Arthur Kreymer
62 1 Arthur Kreymer
Oncoming local (or remote) shifter must call the Remote MINOS+ Station before the end of
63 1 Arthur Kreymer
the shift in order to be updated with the status of the experiment.\
64 1 Arthur Kreymer
* The remote shift announce must be removed from the MINOS+ Control Room display.\
65 1 Arthur Kreymer
* *The remote shifter should state, in the Logbook, that the remote shift has ended.*
66 1 Arthur Kreymer
* If the new shifter is a local shifter, then the Main Control Room must be informed that MINOS+ is the current NuMI contact.
67 1 Arthur Kreymer
+The step in italic should be removed,  since NOvA is now responsible for the
68 1 Arthur Kreymer
NuMI+