Project

General

Profile

Wiki » History » Version 251

Jason St. John, 04/12/2016 03:31 PM

1 104 Jennifer Raaf
!https:/redmine/attachments/download/17373/Lariat_Logo_256.jpg!  
2 104 Jennifer Raaf
 
3 218 Jason St. John
ROC West x5413
4 1 William Badgett
MCenter Control Room (MC-CR) x3726 or x8871
5 241 Jason St. John
Internationally: prefix *+1 630 840* to the above
6 241 Jason St. John
7 1 William Badgett
h1. Shifter Stuff
8 1 William Badgett
9 147 Jason St. John
* [[Before your first shift at LArIAT]]
10 249 Jason St. John
* +[[LArIAT Run 2 Shifter Instructions]]+ (April 2016)
11 207 Luke Batten
** [[Run Plan]]
12 202 Jason St. John
** "LArIAT Expert Call List":http://lariat.fnal.gov/internal/internal.html  (User is "lariat", password same as docdb)
13 248 Jason St. John
14 248 Jason St. John
{{toc}}
15 1 William Badgett
16 171 Jason St. John
h2. Link summary ( [[quick start]] )
17 166 Steven Dytman
18 245 Jason St. John
* "Live event viewer":http://lariat-wbm.fnal.gov/lariat/evd.html snapshots
19 197 Jason St. John
* "Accelerator Schedule":http://www-ad.fnal.gov/ops/schedule.html  (power outages, etc)
20 246 Jason St. John
* "LArIAT e-Log":http://dbweb0.fnal.gov/ECL/lariat/E/index  For making/ending access, starting/ending shifts.
21 210 Luke Batten
* [[LArIAT DAQ Instructions]] (February 2016)
22 237 Jason St. John
* "LArIAT Run Status Webpage":http://lariat-wbm.fnal.gov/lariat/run-alert.html
23 196 Ryan Linehan
* "LArIAT Run Summary Webpage":http://lariat-wbm.fnal.gov/wbm/servlet/LariatRunSummary
24 213 Luke Batten
* "LArIAT Online DQM":http://lariat-dqm.fnal.gov (works with VPN or VNC or on-site only, for now)
25 164 Johnny Ho
* How to use the [[event viewers]]
26 1 William Badgett
* "Synoptic":https://cdcvs.fnal.gov/redmine/projects/lariat-online/wiki/Using_Synoptic_for_monitoring
27 250 Jason St. John
* "Beam monitoring (ACNET)":https://redmine.fnal.gov/redmine/projects/lariat-online/wiki/Using_ACNET_for_monitoring?parent=Wiki
28 247 Jason St. John
* "Beams Division E-Log":https://www-bd.fnal.gov/Elog/?logNames=Booster%2C+External+Beamlines%2C+Linac%2C+Main+Injector%2C+Operations
29 1 William Badgett
* "MC7 WebCam":http://131.225.176.26/
30 1 William Badgett
31 151 Jason St. John
h3. Important knowledge
32 1 William Badgett
33 149 Jason St. John
* "List of MC7 ACNET devices":https://redmine.fnal.gov/redmine/projects/lariat-online/wiki/MC7_in_ACNET
34 149 Jason St. John
* [[MC-7 Enclosure Layout]]
35 1 William Badgett
* "In case the beam TVs are off":http://www-bd.fnal.gov/notifyservlet/www?project=&refresh=on&infolinks=top
36 1 William Badgett
* [[The LArIAT supercycle]] _How DAQ operations relate to the main injector supercycle_ 
37 151 Jason St. John
* "Hardware-Connections-and-Configurations":https://redmine.fnal.gov/redmine/projects/lariat-online/wiki/Wiki#Hardware-Connections-and-Configurations
38 151 Jason St. John
* "Electronic Hardware Documentation":https://redmine.fnal.gov/redmine/projects/lariat-online/wiki/Wiki#Electronic-Hardware-Documentation
39 132 Jason St. John
40 149 Jason St. John
h3. Obsolete links
41 1 William Badgett
42 202 Jason St. John
* [[LArIAT Run 1 Shifter Instructions]] (June 2015)
43 149 Jason St. John
* -LArIAT Engineering Run (Aug 2014) [[How to Run the Lariat Data Acquisition]]- (OBSOLETE)
44 1 William Badgett
* -"Shifter Instructions":https://docs.google.com/document/d/1mlN_UIOCqwhe0cFiU7mRc3-lxDZhY-4TmIy23rOzILI/pub August 2014- (Some obsolete information)
45 164 Johnny Ho
* -How to make [[Lariat DAQ Plots]]- (OBSOLETE)
46 149 Jason St. John
47 83 Jason St. John
h1. Troubleshooting 
48 1 William Badgett
49 152 Jason St. John
Any time day or night, please call experts if you are in need of help and the answer is not provided below.
50 152 Jason St. John
51 179 Jason St. John
h2. *Trouble getting started*
52 152 Jason St. John
53 205 Luke Batten
* If you cannot ssh to FTBFLX machines: Get a kerberos ticket for yourself: @kinit <yourKerberosPrincipal>@, then ssh ftbf_user@ftbflx18 (or ssh ftbf_user@ftbflx15 or ssh ftbf_user@ftbf-cr-03).
54 216 Luke Batten
* If your Kerberos username and password are good, but you can't log on to FTBFLX[NN] machines:  Have someone who CAN log into those machines check that your kerberos principal appears in @~ftbf_user/.k5login@ in the LArIAT section (email the Run Co-ordinator at stjohn@fnal.gov). 
55 216 Luke Batten
* The same ssh errors may also apply to computers at ROC West. Troubleshoot using the above methods.
56 1 William Badgett
57 152 Jason St. John
h2. *Trigger and DAQ system*
58 152 Jason St. John
59 188 Jason St. John
When the DAQ crashes, please post the relevant information to [[DAQerrors]] for experts to study.
60 188 Jason St. John
61 187 Jason St. John
h3. Common failures:
62 187 Jason St. John
63 243 Jason St. John
* Unable to start a new run: <pre>lost connection
64 243 Jason St. John
Permission denied (gssapi-keyex,gssapi-with-mic)</pre>
65 243 Jason St. John
** Execute the command @$HOME/bin/$USER-kinit.sh@ to change the default principal to the special principal that we use for the DAQ: @lariat/lariat@lariat-daq00.fnal.gov@FNAL.GOV@. Check for this success with @klist@.
66 187 Jason St. John
* DAQ fails with @ERROR: ReadRegisgter ACQUISITION_STATUS CAEN_DGTZ_CommError BoardId 0@  wait 2 minutes, then try to start again.
67 187 Jason St. John
** Try issuing the command @lariatReset 0 1@ waiting more then 5 seconds, and trying again.
68 187 Jason St. John
This command is appropriate when one sees any type of "CAEN_DGTZ" error.  This command will NOT help the persistent ports error.
69 187 Jason St. John
* DAQ fails with @Found persistent communication port still open@
70 187 Jason St. John
** Wait 8 minutes for the ports to clear, then try again.
71 224 Pawel Kryczynski
* DAQ fails with "An exception occurred when trying to send a message to ..." 
72 223 Pawel Kryczynski
** Check that the terminal you are running the DAQ from is indeed lariat-daq00 (or a screen within it).  Output from @klist@ should show the default principal as "lariat/lariat/lariat-cr-02.fnal.gov@FNAL.GOV" or similar if running from a screen off lariat-daq00 from the ROC-West station.
73 242 Jason St. John
** Run number failed increment or has reset to a low number such as 1: Stop the run and then on the DAQ terminal edit @/opt/lariat-online/config/runNumber.dat@ to correct the run number. Start new run after.
74 187 Jason St. John
75 187 Jason St. John
h3. Other failures: 
76 187 Jason St. John
77 1 William Badgett
* If the DAQ is having trouble talking to the crates, try issuing the command @lariatReset 0 1@ waiting more then 5 seconds, and trying again.
78 187 Jason St. John
This command is appropriate when one sees any type of "CAEN_DGTZ" error.  This command will NOT help the persistent ports error.
79 227 Jason St. John
* *No triggers at all* If the trigger crate has been power cycled and the V1495 is not emitting triggers: [[Reset1495]]
80 226 Jason St. John
* *Run Status page not updating* 
81 226 Jason St. John
** Try refreshing the page. 
82 227 Jason St. John
** If the ACNET node has gone down (as in a power loss) may need to re-start the tomcat servlet: @ssh tomcat@lariat-wbm.fnal.gov@, then @kitty@.  (Yep, "kitty.")
83 83 Jason St. John
84 152 Jason St. John
h2. *Wire Chambers*
85 152 Jason St. John
86 228 Jason St. John
Nominal Voltages:
87 229 Flor de maria Blaszczyk
|_. WC1 | -2425 |
88 228 Jason St. John
|_. WC2 | -2400 |
89 229 Flor de maria Blaszczyk
|_. WC3 | -2425 |
90 228 Jason St. John
|_. WC4 | -2450 |
91 228 Jason St. John
92 238 Flor de maria Blaszczyk
* If the wire chambers HV trips: "instructions for controls via Synoptic":https://cdcvs.fnal.gov/redmine/projects/lariat-online/wiki/Using_Synoptic_for_monitoring#4-Synoptic-power-supplies-controls
93 135 Jason St. John
* If the wire chambers are acting strangely: "remote power cycling instructions":https://redmine.fnal.gov/redmine/projects/lariat-online/wiki/Communicating_with_the_wire_chambers including mini-DAQ and telnet interface.
94 83 Jason St. John
* If the wire chamber system is skipping spill numbers, it may be a high trigger rate (> 30 k per spill).  The wire chamber controller may still be reading out the hits from the last spill.
95 1 William Badgett
96 231 Flor de maria Blaszczyk
h2. *High voltage for the wire chambers, TPC wireplane bias, cryo PMTs*
97 230 Flor de maria Blaszczyk
98 240 Jason St. John
%{color:red}Important! Follow instructions in link below if cathode HV trips off due to LAr level interlock.%
99 240 Jason St. John
[[Drift HV]] TPC Cathode Voltage
100 240 Jason St. John
101 235 Flor de maria Blaszczyk
"*Instructions for controls via Synoptic*":https://cdcvs.fnal.gov/redmine/projects/lariat-online/wiki/Using_Synoptic_for_monitoring#section-10
102 230 Flor de maria Blaszczyk
103 236 Flor de maria Blaszczyk
Also valid for some of the muon range stack paddles (1-8), the halo veto and 1 aerogel PMT.
104 236 Flor de maria Blaszczyk
105 230 Flor de maria Blaszczyk
*ONLY IF SYNOPTIC DOESN'T WORK* "Instructions for controls via ACNET":https://cdcvs.fnal.gov/redmine/projects/lariat-online/wiki/Using_ACNET_to_power_up_the_power_supplies
106 230 Flor de maria Blaszczyk
107 230 Flor de maria Blaszczyk
* The readback voltage doesn't make any sense, is of the wrong polarity and/or is way above the nominal value, but just for a fraction of time.
108 230 Flor de maria Blaszczyk
This is most likely just a glitch in the readout, please ignore if it happens once or twice. If it happens too frequently, set voltage to 0, turn off the power supply and report it. 
109 230 Flor de maria Blaszczyk
110 230 Flor de maria Blaszczyk
* The readback voltage doesn't make any sense, is of the wrong polarity and is way above the nominal value, and the value is stable~ish (you might see small fluctuations over time)
111 230 Flor de maria Blaszczyk
This is a typical symptom of a bad power supply. Try to set it back to 0, turn it off and disconnect the SHV cable. If the readout values remain the same, it confirms there is a hardware problem. Please contact Brian Fellenz for repairs if we don't have a spare for that unit.
112 230 Flor de maria Blaszczyk
113 230 Flor de maria Blaszczyk
FYI, the power supplies have a given voltage rating and cannot physically deliver voltages beyond that range. Also, their polarities cannot be swapped so if you see the wrong sign on the readout ie a positive voltage on a negative power supply or vice versa, then you can be sure the unit is broken or you have a problem somewhere else in the system.
114 230 Flor de maria Blaszczyk
- Bias voltage rating: - 500 V for the shield and induction planes, + 500 V for the collection plane.
115 230 Flor de maria Blaszczyk
- ELT and Hamamatsu PMTs: +2000 V
116 230 Flor de maria Blaszczyk
- All of the other units: -2000 V
117 230 Flor de maria Blaszczyk
118 230 Flor de maria Blaszczyk
* Something went wrong during a ramp, I need to turn off the supply!
119 230 Flor de maria Blaszczyk
There is an interlock that prevents you from using the normal fast controls on the power supply when a ramp is on-going. First, *stop the ramp by clicking on the STOP button*. This will stop the ramp and clear the interlock. If you need to go back to 0 quickly, use the fast controls to set the voltage to 0 and *don't forget to turn off the supply!*
120 230 Flor de maria Blaszczyk
121 230 Flor de maria Blaszczyk
*Even if the controls appear not to respond, set the voltage to 0 and turn the supply off*. Contact Charlie Briegel first and describe the problem in detail. If you can and if it's safe, disconnect the SHV cable from the power supply. If the readback values remain the same, then the power supply is broken.
122 230 Flor de maria Blaszczyk
123 232 Flor de maria Blaszczyk
* *ACNET controls expert: Charles (Charlie) Briegel, x4510 briegel@fnal.gov*  
124 232 Flor de maria Blaszczyk
* *VME power supplies repairs / replacements: Brian Fellenz, x2512 fellenz@fnal.gov*
125 230 Flor de maria Blaszczyk
126 225 Roberto Acciarri
h2. *Event Viewer*
127 225 Roberto Acciarri
128 225 Roberto Acciarri
* If the event viewer stops cycling through the events and the terminal from which it is running shows a list of lines saying something like _"event XX in file, but on event 0"_ with _XX_ any number,
129 225 Roberto Acciarri
** _*ctrl+z*_ 
130 225 Roberto Acciarri
** _*ps -def*_ to look at the processes list. Look for the job ID of the process _"python /lariat/app/users/EventViewer/..."_ 
131 225 Roberto Acciarri
** _*kill -9 JobID*_ to kill the event viewer
132 225 Roberto Acciarri
** open a new event viewer
133 225 Roberto Acciarri
134 225 Roberto Acciarri
* If the problem persists and/or become more frequent, exit the session you are in and try to connect from a different gpvm machine 
135 181 Jason St. John
136 181 Jason St. John
h2. Power Cycle the ASICs (TPC Wire Noise)
137 181 Jason St. John
138 217 Flor de maria Blaszczyk
* Anecdotal evidence has shown that analog noise on the TPC wire readout channels can be 
139 217 Flor de maria Blaszczyk
alleviated by power cycling the TPC electronics: ASICs and Warm Receiver/Drivers
140 219 Flor de maria Blaszczyk
* You can remotely power cycle the TPC electronics.  Log onto lariat-gateway00.fnal.gov with X-forwarding enabled, type "firefox", and go to http://lariat-pdu02.fnal.gov.  Usename "ftbf" (password posted on whiteboard in MC7).  Choose the *CYCLE* option, which will automatically give a 60 
141 220 Flor de maria Blaszczyk
second powerless interlude.
142 220 Flor de maria Blaszczyk
* Further important informations can be found on the white board in MC-CR.
143 219 Flor de maria Blaszczyk
* This mechanism is controlled by a smart power distribution unit (PDU) located under the 
144 220 Flor de maria Blaszczyk
TPC electronics power supply near the cryostat in the enclosure.   Due to electrical safety 
145 220 Flor de maria Blaszczyk
rules you must *NOT* use any of the other outlets on this PDU.  Do *NOT* remove the protective 
146 219 Flor de maria Blaszczyk
outlet covers at any time.
147 220 Flor de maria Blaszczyk
!https://redmine.fnal.gov/redmine/attachments/download/25467/lariat-pdu02-cycle.png!
148 220 Flor de maria Blaszczyk
149 1 William Badgett
h2. Recover from a LAr level interlock
150 220 Flor de maria Blaszczyk
151 221 Flor de maria Blaszczyk
Assuming the LAr Level dropped low enough to trip off the TPC Cathode power supply, and maybe you even powered down the PMTs.
152 221 Flor de maria Blaszczyk
153 221 Flor de maria Blaszczyk
# Be sure HV is set to zero for these: Cathode Drift, Wire Bias, cryo-PMTs
154 220 Flor de maria Blaszczyk
How to control the [[Drift HV]]
155 219 Flor de maria Blaszczyk
# Power down the ASICs. (They should be off when TPC voltages change.)
156 220 Flor de maria Blaszczyk
# Bring up the Cathode
157 219 Flor de maria Blaszczyk
# Bring up the Wire Bias
158 221 Flor de maria Blaszczyk
# Bring up the ASICs
159 219 Flor de maria Blaszczyk
# Bring up the PMTs
160 219 Flor de maria Blaszczyk
161 219 Flor de maria Blaszczyk
162 219 Flor de maria Blaszczyk
163 217 Flor de maria Blaszczyk
h2. Synoptic troubleshooting
164 217 Flor de maria Blaszczyk
165 217 Flor de maria Blaszczyk
%{color:red}"Synoptic Troubleshooting":https://cdcvs.fnal.gov/redmine/projects/lariat-online/wiki/Using_Synoptic_for_monitoring#Troubleshooting%
166 217 Flor de maria Blaszczyk
167 217 Flor de maria Blaszczyk
168 68 Michael Kordosky
h1. Hardware Connections and Configurations
169 1 William Badgett
170 141 William Badgett
* [[TPC Channel Mapping]]
171 51 Jason St. John
* [[Non-TPC Detectors]] *Naming and numbering in MC7*
172 133 Jason St. John
* "Cable Patch Panel Spreadsheet":http://goo.gl/JXiH8Y
173 54 Jason St. John
* [[Connections on the Control Room Patch Panel]]
174 54 Jason St. John
175 51 Jason St. John
* [[Logical inputs to the CAEN V1740]]
176 51 Jason St. John
* [[Connections into the WUT TDC]]
177 51 Jason St. John
* [[Connections into the V1751 Digitizer]]
178 1 William Badgett
* [[Trigger inputs|Connections in/out of the V1495 Trigger]]
179 68 Michael Kordosky
* [[Logic pulse widths and discriminator thresholds]]
180 68 Michael Kordosky
* [[WUT configuration]]
181 74 William Badgett
* [[Timing of ACnet TCLK Events]]
182 140 William Badgett
* The [[Teensy]] LAr ASIC controller's configuration
183 50 Michael Kordosky
184 138 Roberto Acciarri
* [[Punch Through counters voltages and rates ]]
185 138 Roberto Acciarri
186 102 Jason St. John
h1. Electronic Hardware Documentation
187 45 Michael Kordosky
188 51 Jason St. John
* Link to LArIAT eLog http://dbweb0.fnal.gov/ECL/lariat
189 51 Jason St. John
* [[LariatOnlineGit]] Accessing the LArIAT Online GIT repository
190 98 Brian Rebel
* [[Building LArIATOnline with CMake]]
191 44 Michael Kordosky
192 51 Jason St. John
* [[LArIAT TPC Readout Parameters]]
193 185 William Badgett
* [[LArASIC Preamp Documentation from BNL]]
194 51 Jason St. John
* [[LArIAT DAQ Commercial Products]] Technical Documentation and Firmware Files
195 101 William Badgett
* [[LArIAT CAEN Products]] Technical Documentation and Firmware Files
196 51 Jason St. John
* Test Beam Wire Chamber Sten Hensen's [[TDC Readout Documentation]]
197 89 William Badgett
* WUT Wave Union TDC: [[Jinyuan's TDC Documentation]]
198 51 Jason St. John
* [[v1495 notes]] Notes and working area for the V1495 and V2718
199 195 Johnny Ho
* [[A3818 PCI optical controller]] links
200 35 Michael Kordosky
201 1 William Badgett
* [[DAQ Configuration]] settings, parameters, starting a run
202 51 Jason St. John
* [[Raw Data Format and Readout Source code]]
203 100 John Freeman
* [[All things lariat-artdaq]] (UPDATED 11/5/14)
204 154 Jason St. John
* [[Interpreting Wire Chamber TDC Data]]
205 36 Michael Kordosky
206 54 Jason St. John
* [[LArIAT Test Stand]] Photographs
207 47 Michael Kordosky
208 72 Michael Kordosky
h1. Diagnostic and Control Software
209 72 Michael Kordosky
210 73 Michael Kordosky
_Test programs in the_ lariat-online/daq/src _directory_
211 73 Michael Kordosky
212 72 Michael Kordosky
* [[DumpDigitizerData]]
213 72 Michael Kordosky
* [[SummarizeDAQOutput]]
214 72 Michael Kordosky
* [[Reset1495]]
215 72 Michael Kordosky
* [[ScalarReadout]]
216 97 Pawel Kryczynski
* [[Data_quality_monitoring_module]]
217 72 Michael Kordosky
218 139 William Badgett
* CAEN's [[WaveDump]] utility
219 139 William Badgett
220 75 Jason St. John
h1. Examining the WC mini DAQ ASCII data
221 75 Jason St. John
222 75 Jason St. John
The Processor makes TTrees from the ASCII files saved by @mc7-daq.py@
223 82 Jason St. John
[[WC MiniDAQ Data Processor]]
224 75 Jason St. John
225 153 Jason St. John
h1. Data Files from the year 2013
226 76 Will Flanagan
227 85 William Badgett
Data files for various beam conditions can be found in the [[DataFiles]] page.
228 85 William Badgett
229 51 Jason St. John
h1. Meetings
230 51 Jason St. John
231 51 Jason St. John
* [[Connecting to LArIAT ReadyTalk]]
232 198 Johnny Ho
233 1 William Badgett
h1. Miscellaneous
234 198 Johnny Ho
235 216 Luke Batten
* The control room shifter computer (MCenter) can be logged into as ftbf_user@ftbflx18.fnal.gov after passing through lariat-gateway.fnal.gov
236 198 Johnny Ho
* [[Proxy using SSH tunnel]]