MCenter Control Room (MC-CR) x3726 or x8871
  • Call the Main Control Room (x3721) at the start and at the end of shift. This is required, and pleasant.
  • If the beam goes away for more than a few spills, look for Accelerator Alarms in ACNET (a default window). If the problem persists a few minutes, and you see nothing about it in the MCR elog, (or you just really want to find out more), call the MCR. They're friendly, though they may be super-busy.

Shifter Stuff

Link summary

Important knowledge

Obsolete links

Troubleshooting

Any time day or night, please call experts if you are in need of help and the answer is not provided below.

Getting started

  • If you cannot ssh to FTBFLX machines: Get a kerberos ticket for yourself: kinit <yourKerberosPrincipal>, then ssh ftbf_user@ftbflx01 (or whichever machine...).
  • If your Kerberos username and password are good, but you can't log on to FTBFLX[NN] machines: Have someone who CAN log into those machines heck that your kerberos principal appears in ~ftbf_user/.k5login in the LArIAT section.

Trigger and DAQ system

  • If the trigger crate has been power cycled and the V1495 is not emitting triggers: Reset1495
  • If the DAQ cannot initialize, and you suspect the configuration XML files were changed recently, check their formatting. XML Checker
  • If the DAQ is having trouble talking to the crates, try issuing the command lariatReset 0 1 and trying again.

Wire Chambers

  • If the wire chambers are acting strangely: remote power cycling instructions including mini-DAQ and telnet interface.
  • If the wire chamber system is skipping spill numbers, it may be a high trigger rate (> 30 k per spill). The wire chamber controller may still be reading out the hits from the last spill.

TPC Wire Noise

  • Anecdotal evidence has shown that analog noise on the TPC wire readout channels can be
    alleviated by power cycling the TPC electronics, ASICs and Warm Receiver/Drivers
  • You can remotely power cycle the TPC electronics via the web site http:://lariat-pdu02.fnal.gov
    logging in as user "ftbf" Further informations can be found on the white board in MC-CR.
  • This mechanism is controlled by a smart power distribution unit (PDU) located under the
    TPC electronics power supply near the cryostat in the enclosure. Due to electrical safety
    rules you must NOT use any of the other outlets on this PDU. Do NOT remove the protective
    outlet covers at any time.

Hardware Connections and Configurations

Electronic Hardware Documentation

Diagnostic and Control Software

Test programs in the lariat-online/daq/src directory

Examining the WC mini DAQ ASCII data

The Processor makes TTrees from the ASCII files saved by mc7-daq.py
WC MiniDAQ Data Processor

Data Files from the year 2013

Data files for various beam conditions can be found in the DataFiles page.

Meetings