Please help keep this list complete and up to date.

Important notes

Always: Please Keep F:MC6IC at or below 2E9 ppp (for halo management reasons)
Communicate with the MCR to keep the primary protons at this device close to this level.

If the Wire Chambers trip too often (several times per hour), turn off the power supply! And call the run coordinator.

Planned beam interruptions

Time and duration Reason notes
Tharsday 2016-04-14 08:30-09:00 LAr Dewar refill open access
Thersday 2016-04-21 08:30-09:00 LAr Dewar refill open access
Week of 2016-04-27, 07:30, ~hours Interlock testing no beam, no access
Thirsday 2016-04-18 08:30-09:00 LAr Dewar refill open access
Thorsday 2016-05-05 07:00-09:00 LAr Dewar refill open access
Thursday 2016-05-12 08:30-09:00 LAr Dewar refill open access

In case the beam goes down

This condition is now handled automatically. Do nothing special unless the DAQ will not run. As usual, call and expert if you cannot solve the problem quickly on your own.

Missing Switchyard signals $30 and $36 should be faked by an ACNET script if they are dropped from the timeline:
  • If the last SWYD was < 120 seconds ago, go to/stay in Beam On mode
  • If the last SWYD was >120 seconds ago, go to/stay in Beam Off Mode by sending fake $30 and $36 based on $00 and delays

Current Runs

If asked by MCR what kind of beam you'd like please specify these:

  • MC6IC less than 2E9
  • Steady intensity during the spill: Linear rise on MC6IC during the spill.
  • MC7U09 and MC7U10 minimized while
  • MC7U11 and MC7U12 maximized

For the other parameters, see the table below.

(If a 'quantity' i.e. BEAMON, is the first in the list, and doesn't have a sign (+ -) in front of it, it's assumed to be positive).

Beam Request Tertiary Beam Magnet Polarity/Current Trigger Configuration Components Duration Notes
+64 GeV with MC6IC @ ~1e9 -60 A PULSER+PEDESTALON-SCINTGATE-BUSYA-BUSYC
BEAMON+USTOF+DSTOF+WCCOINC3OF4-PUNCH-MURS
BEAMON+USTOF+DSTOF+WCCOINC3OF4+PUNCH+MURS
BEAMON+USTOF+DSTOF+WCCOINC3OF4+PUNCH-MURS
BEAMON+USTOF+DSTOF+WCCOINC3OF4+MURS-PUNCH
COSMIC+COSMICON
MICHEL+COSMICON
V1740 V1740B V1751 V2781 V1495 TDC WUT LARASIC 2016.04.18 run 9095 - two weeks ongoing
+64 GeV with MC6IC @ ~1e9 -100 A PULSER+PEDESTALON-SCINTGATE-BUSYA-BUSYC
BEAMON+USTOF+DSTOF+WCCOINC3OF4-PUNCH-MURS
BEAMON+USTOF+DSTOF+WCCOINC3OF4+PUNCH+MURS
BEAMON+USTOF+DSTOF+WCCOINC3OF4+PUNCH-MURS
BEAMON+USTOF+DSTOF+WCCOINC3OF4+MURS-PUNCH
COSMIC+COSMICON
MICHEL+COSMICON
V1740 V1740B V1751 V2781 V1495 TDC LARASIC 2016.04.04 run 8767- 2016.04.18 run 9094 DONE
Things were more stable with less halo, with +ve secondary than with -ve secondary
+64 GeV with MC6IC @ 2e9 +100 A PULSER+PEDESTALON-SCINTGATE-BUSYA-BUSYC
BEAMON+USTOF+DSTOF+WCCOINC3OF4-PUNCH-MURS
BEAMON+USTOF+DSTOF+WCCOINC3OF4+PUNCH+MURS
BEAMON+USTOF+DSTOF+WCCOINC3OF4+PUNCH-MURS
BEAMON+USTOF+DSTOF+WCCOINC3OF4+MURS-PUNCH
COSMIC+COSMICON
MICHEL+COSMICON
V1740 V1740B V1751 V2781 V1495 TDC LARASIC 2016.03.15 - 2016.04.04 DONE
+64 GeV with MC6IC @ 2e9 +60 A PULSER+PEDESTALON-SCINTGATE-BUSYA-BUSYC
BEAMON+USTOF+DSTOF+WCCOINC3OF4-PUNCH-MURS
BEAMON+USTOF+DSTOF+WCCOINC3OF4+PUNCH+MURS
BEAMON+USTOF+DSTOF+WCCOINC3OF4+PUNCH-MURS
BEAMON+USTOF+DSTOF+WCCOINC3OF4+MURS-PUNCH
COSMIC+COSMICON
MICHEL+COSMICON
V1740 V1740B V1751 V2781 V1495 TDC LARASIC 2016.02.22 (estimated) - 2016.03.15 DONE

TPC Voltages

Based on e-log entry #2544:
Plane Setting Readback
Shield -298V -298.75V
Induct -27V -18.5V
Collect +340V +338.4V

Investigations and Mysteries

Tasks awaiting accesses

None.

Other investigations

  • How is the TOF pulse height? Clipping in Run2?