Project

General

Profile

LArIAT Run 2 Shifter Instructions » History » Version 70

« Previous - Version 70/119 (diff) - Next » - Current version
Jason St. John, 04/07/2016 10:54 AM


LArIAT Run 2 Shifter Instructions

Remember to call MCR (x3721) at the beginning and ending of each shift!!!
Main Control Room (internationally) +1.630.840.3721

Please don't hesitate to contact the experts when something doesn't look right!!!
Troubleshooting Problems

Before your first shift at LArIAT check here so you're ready.

Log onto the shift computer

For a shift at Fermilab:

  • From an MCenter machine, such as ftbflx18 or ftbflx15:
    • Log in with username = ftbf_user.
  • From a ROC West machine, such as lariat-cr-02:
    • Log in with username = lariat.
  • Password is YOUR kerberos password, then it will ask for YOUR kerberos principal. (Reverse from usual order)

From a remote shift:

  • Start the Fermilab Virtual Private Network (available here https://vpn.fnal.gov )
    • username and password: your own Services Account.
  • Get a kerberos ticket on your machine with kinit
  • Open an ssh tunnel to the shift computer
    ssh -C -L 5900:localhost:5900 lariat@lariat-cr-02.fnal.gov 
  • Direct your VNC viewer to localhost:5900. Password is the same as the docdb password. We recommend RealVNC but others are worth trying in case they work better for you.

Getting your setup ready

Web pages to keep visible

More useful web pages

  • Run Summary of recent runs
  • Using ACNET for monitoring This page contains the instructions to monitor the beam status through ACNET.
  • Synoptic instructions
  • MCR Operations Elog in the new tab This is the Main Control Room (MCR) Elog. Use it to check any possible problem affecting the MCenter beam.
  • LArIAT Elog Log the previous shifter out (if they are logged in), and log yourself in. Make a new entry with the "Start of Shift Checklist" form.

During the shift

  • If you have questions, call an expert! LArIAT Call List
  • Or, you can use Google Hangouts: send an email to to get invitation.
  • As well as Google Hangouts, you can Skype an expert! How to access Skype:
  • On the ftbf_user or lariat account:
    • "cd ~/Downloads/skype-4.3.0.37"
    • "skype"
  • You can find the password in the top right blue box of the whiteboard in the control room.

What beam should I request? The Run Plan lists current and upcoming beam requests, along with the other MCenter activities going on.

Starting a new run

  • Open in a new tab LArIAT DAQ Instructions and follow the instructions to start a new run.
  • The DAQ should make an e-log entry for your automatically.
  • Special cases:

During an ongoing run

  • Monitor the beam status using the instructions in the Using ACNET for monitoring, namely
    • the S60 page of ACNET and
    • the profile plots for MC7WC1 and MC7WC2.
    • From ~ftbf_user/acnet or ~lariat/acnet, run ./LArIATViewer.sh to open the Synoptic displays.
  • Run Status Webpage to monitor the run status (run number, number of spills, number of triggers, etc)
  • Note that, on the Run Status Webpage, if the run time appears red, and the spills stop increasing, the run has come to a stop. It will also speak an audible alert, once.
    • In order to get it running again, you can issue the 'lariatReset' command in the DAQ terminal, followed by 'go'.
    • Sometimes the Run Status page freezes. If this happens, see if your DAQ command line has reset. If so, the run has ended. Follow above instructions.
  • Did the run number fail to increment? If the number has reset to a low number such as 1 stop the run and then edit /opt/lariat-online/config/runNumber.dat to correct the run number. Start new run after.
  • Online DQM to check basic data integrity.
    • If the rate of MWPCs data blocks during the beam spill is not very close to the data block rates of the other systems, debugging this is urgent.
      • On the Data Blocks page, monitor the "Data Block Time Stamps" graph. During the beam (1-5 s) the MWPC line should follow a similar line shape to the V1740 and V1751 lines, and not be too far below.
      • You can isolate plots by hovering over the legend.
  • Use the event viewer to see TPC events. See Event Viewer Instructions . If you decide to post some interesting event in the e-log, please write the number of the spill/event in the title or content of the entry. It's much easier to search for them later!
  • Useful: Recent run history , python scripts for making DQM plots

Troubleshooting

Most problems solved: Troubleshooting Page doesn't help, call an expert

  • If a VME Power Supply has to be turned off in an emergency situation (e.g. problem with TPC PMTs) - turn off the regulate function first, then put the decreasing voltage values in the quick ramp window, go to 0 and then turn off!

At the end of the shift

  • Make an entry in the e-Log using the form "Shift Summary" summing up the relevant information from the shift (make sure to include the total trigger counts for the V1751s and V1740s). For any other information to be posted in the e-Log during the shift use the "default" form.
  • IF NO SHIFTER IS TAKING OVER FROM YOU
    1. Call MCR to stop the beam

Remember to call MCR at the beginning and ending of each shift!!!

Remember to call MCR at the beginning and ending of each shift!!!