Power Down Instructions

In event of a planned power outage then:

  • Power down the LV either using the MIDAS button or via g2tracker2 and g2tracker3

daq
./LowVoltage/TurnBoardsOff.sh

  • Turn off the AC/DC 36V crate
  • Turn off the CAEN HV using the keys on the panel
  • Pull out handles on FC7, AMC13, MCH in that order
  • Turn off the mTCA crate using the power switch
  • As root on g2tracker2 and 3 (use ksu):

shutdown -h now "Shutting down"

  • As root on g2tracker0 (use ksu):

shutdown -h now "Shutting down"

  • Turn off the water chiller and the air cooling to the flobbers

PowerUp Instructions

  • Turn on the water chiller and the air cooling to the flobbers
  • Power up g2tracker0, g2tracker2, g2tracker3 and gm2liv
  • On g2tracker2 and g2tracker3
    Check that you can see the NFS mounted disk i.e. that the automount works

cd /home/daq/tracker/online

If not you may need to this next step:

  • On g2tracker0 as root (ksu)

service iptables stop
exportfs -ra
service nfs restart
exportfs -ra

  • Turn on the AC/DC 36V crate
  • Power up the LV either using the MIDAS button or via g2tracker2/3

daq
./LowVoltage/TurnBoardsOn.sh

  • Turn on the CAEN HV using the keys on the panel
  • Check that handles for FC7, AMC13, MCH are pulled out
  • Turn on the mTCA crate using the power switch
  • Push the handles in for MCH (wait until LEDs settle) then AMC13 (wait until LEDs settle) then FC7
  • Sacrifice a goat.