Project

General

Profile

Minutes 20180911

1. Update on data production (Anna)
  • almost all the FY18 data are produced
  • problems with files when not all calos (24) are turned on (QHistProducer)
  • DQC for 9d dataset done, will be starting 2nd pass soon pending FNAL tape storage problem
2. Pileup work for ratio method (Nick)
  • triple pileup contributes to ~ 2% contamination based on toyMC
  • found ~3% from the data by looking at the pileup scaling
  • need to understand slopes in R vs pileup scale factor and R vs shadow time gap