Project

General

Profile

Minutes 20180417

1) Production (Anna)
  • production is still slow, problem with FTS, solving it now
2) In-fill gain correction (Matthias)
  • looked at bunch-by-bunch gain curve
  • inconclusive with St. Patrick data, more data needed to make conclusion
3) Q-method analysis (Tim)
  • looked at slice-by-slice (vertical or horizontal calo crystals) Q-method spectra
  • CBO effect is enhanced in some of the slices
4) Classification of analysis methods and plans (Kim)
  • classification of T,R,Q,A,E-binned methods
  • plans for Denver meeting, mid and long terms proposed and for debate
  • some groups haven't decided so will need to wait