Project

General

Profile

Minutes 20180403

1) DAQ, nearline CTAG problem
  • long term gain correction implemented so CTAG should be stable for both
  • outstanding mystery of CTAG jump before and after 2-day shutdown (Kim’s on it)
2) Blinding software
  • A draft version provided by Lawrence available in gm2util (soon cvmfs)
  • Installation guide and examples will be provided in the redmine wiki page once the tools are ready
3) Short reports
  • CBO amplitude & lifetime changing (James & Joe) <— need to correlate with info like quad HV, kicker, beam status, etc
  • CTAG jumping around end of March to begin of Apr (Chris) <— need to correlate with info like quad HV, etc
  • Data production status (Anna) <— skipped due to time limit