Daily check list » History » Version 15

Thomas Diehl, 11/18/2013 01:38 PM

1 1 Marc testing Mengel
h1. Daily check list
2 1 Marc testing Mengel
3 1 Marc testing Mengel
h2. Before 2pm
4 6 Thomas Diehl
5 5 Thomas Diehl
# Perform End Of Night Checklist in the logbook if the observers didn't do it.
6 5 Thomas Diehl
# Publish the nightsum in the morning if the observers didn't do it.
7 5 Thomas Diehl
# Complete CTIO end of night report if the observers didn't do it.
8 5 Thomas Diehl
# Be aware of our observers arrival to and departure from the mountain. 
9 1 Marc testing Mengel
# Prepare the nightly plan page, including populating Almanac and Weather info
10 1 Marc testing Mengel
# Check the instrument status (read the logbook, talk to people)
11 1 Marc testing Mengel
# Check the DM status
12 1 Marc testing Mengel
# Check SISPI status 
13 1 Marc testing Mengel
# Check what scripts are needed/present for calibration, SNe, main survey
14 4 Thomas Diehl
# Send out the agenda for the 4pm meeting (if to occur) to des_observers@fnal.gov
15 9 Stephen Kent
# Check diskspace.  Log into one of the observer machines as user "sispi"
16 4 Thomas Diehl
<pre>
17 4 Thomas Diehl
setup SISPI
18 4 Thomas Diehl
check_diskspace
19 4 Thomas Diehl
</pre>
20 4 Thomas Diehl
If any disks are filling up (>90% for observer2, >93% for the pipeline
21 8 Stephen Kent
machines) send an email to Klaus and Ann (kh@physics.osu.edu and
22 8 Stephen Kent
elliotta@mps.ohio-state.edu)
23 4 Thomas Diehl
24 1 Marc testing Mengel
25 2 Thomas Diehl
h2. Late afternoon
26 1 Marc testing Mengel
27 13 Klaus Honscheid
# Check with telops if SISPI instance and the GUIs were restarted.
28 14 Klaus Honscheid
# Ask telops to point telescope to white spot and fire afternoon calibration scripts
29 14 Klaus Honscheid
# Chair the 4pm meeting and present observing plan
30 1 Marc testing Mengel
# Edit the observing plan if needed
31 1 Marc testing Mengel
# Perform the Late Afternoon Checklist in the logbook
32 15 Thomas Diehl
# "Mark Exposures not to be processed"
33 11 Thomas Diehl
# "Implement the data quality":https://cdcvs.fnal.gov/redmine/projects/desops/wiki/DM_into_Database
34 5 Thomas Diehl
# Make sure observers are present and roles are defined/understood
35 1 Marc testing Mengel
36 5 Thomas Diehl
37 1 Marc testing Mengel
h2. Night
38 1 Marc testing Mengel
39 1 Marc testing Mengel
# Check that the dome flats finished ok
40 3 Thomas Diehl
# Perform the Beginning of Night Checklist in the logbook
41 3 Thomas Diehl
# Write the Synopsis_Night logbook entry 
42 3 Thomas Diehl
# Keep the logbook 
43 7 Thomas Diehl
# Make sure the observers understand what they are doing
44 7 Thomas Diehl
# Make sure the observers get off to a good start
45 7 Thomas Diehl
# Be available to the observers if they have questions or problems
46 7 Thomas Diehl
# Try to get some sleep