Project

General

Profile

Daily check list » History » Version 1

Marc testing Mengel, 08/26/2013 11:09 AM
auto-upload

1 1 Marc testing Mengel
h1. Daily check list
2 1 Marc testing Mengel
3 1 Marc testing Mengel
h2. Before 2pm
4 1 Marc testing Mengel
5 1 Marc testing Mengel
# Check that all observers are present and roles are defined/understood
6 1 Marc testing Mengel
# Prepare the nightly plan page, including populating Almanac and Weather info
7 1 Marc testing Mengel
# Check the instrument status (read the logbook, talk to people)
8 1 Marc testing Mengel
# Check the DM status
9 1 Marc testing Mengel
# Check SISPI status 
10 1 Marc testing Mengel
# Check what scripts are needed/present for calibration, SNe, main survey
11 1 Marc testing Mengel
# Send out the agenda for the 4pm meeting
12 1 Marc testing Mengel
13 1 Marc testing Mengel
h2. Late afernoon
14 1 Marc testing Mengel
15 1 Marc testing Mengel
# Restart sispi instance
16 1 Marc testing Mengel
# Point telescope to white spot and fire afternoon calibration scripts
17 1 Marc testing Mengel
# Chair the 4pm meeting
18 1 Marc testing Mengel
# Edit the observing plan if needed
19 1 Marc testing Mengel
# Perform the Late Afternoon Checklist in the logbook
20 1 Marc testing Mengel
21 1 Marc testing Mengel
h2. Night
22 1 Marc testing Mengel
23 1 Marc testing Mengel
# Check that the dome flats finished ok
24 1 Marc testing Mengel
# Perform the Beginning of Night Checklist in the logbook
25 1 Marc testing Mengel
# Write the Synopsis_Night logbook entry 
26 1 Marc testing Mengel
# Keep the logbook 
27 1 Marc testing Mengel
# Perform End Of Night Checklist in the logbook
28 1 Marc testing Mengel
# Publish the nightsum at the end of the night
29 1 Marc testing Mengel
# Complete CTIO end of night report