Project

General

Profile

Point-R4 » History » Version 1

Version 1/3 - Next » - Current version
Kenneth Patton, 07/16/2012 10:22 AM


Point-R4

The time from the issuance of a 2 degree slew to the opening of the shutter is no more than 20 seconds. Telescope encoders do not record pointing deviations of more than 0.2” from commanded position in the 5 seconds after the shutter opens.

Prerequisites

Procedure

Verdict

Consequences