Observing Plan for the November 10, 2014 Engineering Night

Primary Mirror & 4MAP tests

Stability check

1) Move to 5degrees from Zenith, Take 5 in-focus r Band, 30 sec exposures to set focus & alignment

2) Turn AOS off, add +1500 to Focus Trim, leave other Trim values in place

3) Take 10 r band 30 second images

4Map settling study

1) Stay out-of-focus

2) Tweak Astigmatism: ct2mag 1000nm ct2ang 0

3) Take 5 images

4) remove Astigmatism Tweak

5) Take 5 images

6) repeat as desired

4Map sensitivity matrix study

1) remove Astigmatism Tweak, stay out of focus

2) take 3 images, r band, 30 seconds

3) Tweak Astigmatism: ct2mag 1000nm ct2ang 180

4) take 3 images, r band, 30 secons

5) Tweak Trefoil, ct2mag 1000nm ct2ang

Install Astigmatism and Trefoil LUT

Night

Primary mirror tests

Active Optics Reference Mesh Test