Project

General

Profile

IQ-R4 » History » Version 1

Jiangang Hao, 07/02/2012 03:54 PM

1 1 Jiangang Hao
h1. IQ-R4
2 1 Jiangang Hao
3 1 Jiangang Hao
Requirements:
4 1 Jiangang Hao
5 1 Jiangang Hao
* TO.2: The delivered PSF from the telescope, instrument, and other factors exclusive of the site seeing will be no greater than 0.55 arcsec FWHM (DES-doc-806-v25).
6 1 Jiangang Hao
7 1 Jiangang Hao
* R-18: The PSF FWHM in each of the r, i, and z bands should, over all exposures and over the survey area, have a median of less than 0.9”. Moreover, for 95% of the survey area, there should be at least one exposure in each of these bands for which the mean PSF FWHM is 0.9” or smaller (DES-doc-20-v32).
8 1 Jiangang Hao
9 1 Jiangang Hao
10 1 Jiangang Hao
11 1 Jiangang Hao
Procedures: 
12 1 Jiangang Hao
13 1 Jiangang Hao
1. Check TO.2:
14 1 Jiangang Hao
* When pointing to the Zenith, the PSF FWHM from DECam are compared to the CTIO DIMM seeing measurements according to the model FWHM^2 = DIMM^2 + \sigma^2. The best fit value is \sigma <= 0.55" across the full array. Therefore, we can measure the contribution of the PSF from the DECam by subtracting the DIMM seeing from the measured PSF by quadrature. 
15 1 Jiangang Hao
16 1 Jiangang Hao
* Step 1: