Project

General

Profile

BD+17 4708

SV requirements and goals associated with this analysis

Analysis

  • The field containing BD+17 has been observed on multiple clear nights.
  • These data have been processed as part of the DESDM First Cut processing.
  • Huan Lin and Bob Armstrong have also been analyzing these data with regards to the AB_ratio_variation.
  • Fortunately, BD+17 does not appear to fall on one of the CCDs showing the AB_ratio_variation effect.

Results (as of Nov 24, 2012)

  • In progress
  • The Cal-R7 requirement has been partially met.
  • A major part of this requirement was just obtaining the data.

Attached Files