Technical documentation

Cosmogenics Tasks Force technical note 4231

01/11/2016 10:01 PM

Reference documentation

David Kaleko'studies on $\nu_e$ searches at MicroBooNE

01/11/2016 10:03 PM

Overburden scenarios for MC production

01/13/2016 11:59 AM

Only Top OB:

  • 6 ft option (~2m)
  1. 6 ft concrete
  2. 3 ft concrete + 3 ft dirt
  3. 3 ft concrete + 1 ft barite
  4. 3 ft concrete + 2 ft barite
  • 9 ft option (~9.8m)
  1. 9 ft concrete
  2. 6 ft concrete + 3 ft dirt
  3. 6 ft concrete + 1 ft barite
    ...