h1. Mingqian practice

h1. Measurement of the hall

Move the cables out 1' from the left site of the veto to cross the pipe then bring then up to the cable tray.

!{width:400px}https://cdcvs.fnal.gov/redmine/attachments/download/29822/IMG_7396.jpg!

Move the cables out 6'' from the right side of the veto and then bring them up to the cable tray.

!{width:400px}https://cdcvs.fnal.gov/redmine/attachments/download/29835/IMG_7397.jpg!

It is proposed that the current cable tray (located a couple of feet above the Veto Wall) be removed and places a foot above the Veto Wall.

!{width:400px}https://cdcvs.fnal.gov/redmine/attachments/download/29834/IMG_7394.jpg!

There's a cable tray 2' under the second platform and it is half full.

!{width:400px}https://cdcvs.fnal.gov/redmine/attachments/download/29836/IMG_7392.jpg!

!{width:400px}https://cdcvs.fnal.gov/redmine/attachments/download/29837/IMG_7398.jpg!

h1. There're four possible ways to route the cables.

h2. Option1:

!{width:800px}https://cdcvs.fnal.gov/redmine/attachments/download/29969/屏幕快照%202015-10-26%20下午9.02.35.png!

h2. Other options:

h2. Option 2:

!{width:800px}https://cdcvs.fnal.gov/redmine/attachments/download/29970/屏幕快照%202015-10-26%20下午9.02.54.png!

h2. Option 3:

!{width:800px}https://cdcvs.fnal.gov/redmine/attachments/download/29971/屏幕快照%202015-10-26%20下午9.03.04.png!

h2. Option 4:

!{width:800px}https://cdcvs.fnal.gov/redmine/attachments/download/29972/屏幕快照%202015-10-26%20下午9.03.17.png!


routes the left veto wall cables to the left of the Veto Wall, underneath the second floor walkway. All the cables need to be of 598 feet in length. A foot for slack from the pmt to mounting on the wall, 13' to the top of the wall and then another foot to get to the cable tray, then XX feet to the rack
Two cable trays already exist but there is a 2-3' gap that needs to be filled. It is proposed that the current cable tray (located a couple of feet above the Veto Wall) be removed and places a foot above the Veto Wall, for right side cables that need to run to the other side of the wall.