Mingqian practice

Measurement of Oct 21

Measurement of the hall!

Move the cables out 1' from the left site of the veto to cross the pipe then bring then up to the cable tray.

Move the cables out 6'' from the right side of the veto and then bring them up to the cable tray.

It is proposed that the current cable tray (located a couple of feet above the Veto Wall) be removed and places a foot above the Veto Wall.

There's a cable tray 2' under the second platform and it is half full.

h2.There're three ways to route the cables.

h2.Option1:

!{width:700px}https://cdcvs.fnal.gov/redmine/attachments/download/29839/屏幕快照%202015-10-23%20上午11.22.21.png!

!{width:700px}https://cdcvs.fnal.gov/redmine/attachments/download/29840/屏幕快照%202015-10-23%20上午11.22.36.png!

!{width:700px}https://cdcvs.fnal.gov/redmine/attachments/download/29841/屏幕快照%202015-10-23%20上午11.22.46.png!

And then more text here.