Mingqian practice » History » Version 19

Mngqian Chen, 10/23/2015 11:23 AM

1 1 Matthew Wetstein
h1. Mingqian practice
2 1 Matthew Wetstein
3 2 Mngqian Chen
h2. Measurement of Oct 21
4 3 Mngqian Chen
5 3 Mngqian Chen
h2. Three ways to arrange the cables
6 3 Mngqian Chen
7 5 Mngqian Chen
h2. Measurement of the hall!
8 6 Carrie McGivern
9 15 Mngqian Chen
Move the cables out 1' from the left site of the veto to cross the pipe then bring then up to the cable tray. 
10 6 Carrie McGivern
11 8 Carrie McGivern
!{width:400px}https://cdcvs.fnal.gov/redmine/attachments/download/29822/IMG_7396.jpg!
12 9 Carrie McGivern
13 15 Mngqian Chen
Move the cables out 6'' from the right side of the veto and then bring them up to the cable tray.
14 14 Mngqian Chen
15 14 Mngqian Chen
!{width:400px}https://cdcvs.fnal.gov/redmine/attachments/download/29835/IMG_7397.jpg!
16 14 Mngqian Chen
17 13 Mngqian Chen
It is proposed that the current cable tray (located a couple of feet above the Veto Wall) be removed and places a foot above the Veto Wall.
18 13 Mngqian Chen
19 12 Mngqian Chen
!{width:400px}https://cdcvs.fnal.gov/redmine/attachments/download/29834/IMG_7394.jpg!
20 11 Mngqian Chen
21 16 Mngqian Chen
There's a cable tray 2' under the second platform and it is half full.
22 16 Mngqian Chen
23 17 Mngqian Chen
!{width:400px}https://cdcvs.fnal.gov/redmine/attachments/download/29836/IMG_7392.jpg!
24 17 Mngqian Chen
25 18 Mngqian Chen
!{width:400px}https://cdcvs.fnal.gov/redmine/attachments/download/29837/IMG_7398.jpg!
26 18 Mngqian Chen
27 19 Mngqian Chen
There're three ways to route the cables.
28 19 Mngqian Chen
29 19 Mngqian Chen
Option1:
30 19 Mngqian Chen
31 19 Mngqian Chen
32 19 Mngqian Chen
33 19 Mngqian Chen
!{width:400px}!
34 19 Mngqian Chen
35 16 Mngqian Chen
36 9 Carrie McGivern
And then more text here.