h1. Mingqian practice

h2. Measurement of Oct 21

h2. Three ways to arrange the cables

h2. Measurement of the hall!

Move the cables out 1' from the left site of the veto to cross the pipe then take then up.

!{width:400px}https://cdcvs.fnal.gov/redmine/attachments/download/29822/IMG_7396.jpg!

Move the cables out 6'' from the right side of the veto

!{width:400px}https://cdcvs.fnal.gov/redmine/attachments/download/29835/IMG_7397.jpg!

It is proposed that the current cable tray (located a couple of feet above the Veto Wall) be removed and places a foot above the Veto Wall.

!{width:400px}https://cdcvs.fnal.gov/redmine/attachments/download/29834/IMG_7394.jpg!

And then more text here.